{"title":"双子座正在进行和未来的仪器升级","authors":"R. Diaz, S. Goodsell, S. Kleinman, P. Hirst","doi":"10.1117/12.2562401","DOIUrl":null,"url":null,"abstract":"Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.","PeriodicalId":215000,"journal":{"name":"Ground-based and Airborne Instrumentation for Astronomy VIII","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Ongoing and future instrument upgrades at Gemini\",\"authors\":\"R. Diaz, S. Goodsell, S. Kleinman, P. Hirst\",\"doi\":\"10.1117/12.2562401\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.\",\"PeriodicalId\":215000,\"journal\":{\"name\":\"Ground-based and Airborne Instrumentation for Astronomy VIII\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ground-based and Airborne Instrumentation for Astronomy VIII\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2562401\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ground-based and Airborne Instrumentation for Astronomy VIII","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2562401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.