双子座正在进行和未来的仪器升级

R. Diaz, S. Goodsell, S. Kleinman, P. Hirst
{"title":"双子座正在进行和未来的仪器升级","authors":"R. Diaz, S. Goodsell, S. Kleinman, P. Hirst","doi":"10.1117/12.2562401","DOIUrl":null,"url":null,"abstract":"Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.","PeriodicalId":215000,"journal":{"name":"Ground-based and Airborne Instrumentation for Astronomy VIII","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Ongoing and future instrument upgrades at Gemini\",\"authors\":\"R. Diaz, S. Goodsell, S. Kleinman, P. Hirst\",\"doi\":\"10.1117/12.2562401\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.\",\"PeriodicalId\":215000,\"journal\":{\"name\":\"Ground-based and Airborne Instrumentation for Astronomy VIII\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ground-based and Airborne Instrumentation for Astronomy VIII\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2562401\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ground-based and Airborne Instrumentation for Astronomy VIII","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2562401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

鉴于技术和预算的限制,双子座天文台致力于为其社区提供最具竞争力的仪器套件。天文台在每台8米望远镜上设有4台设施仪器和1个AO系统。新设备的引进,高分辨率摄谱仪的建立,多通道瞬态源跟踪的主力军的建立,以及多共轭AO系统的设计。我们还对主要仪器进行了三次主要升级,并实施了一项长期计划,以支持用户驱动的升级。本文总结了过去三年仪器升级计划的结果,并对我们保持仪器套件竞争力的策略进行了更新。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Ongoing and future instrument upgrades at Gemini
Gemini Observatory is committed to providing its community with the best possible competitive instrumentation suite given technological and budget constraints. The Observatory operates 4 facility instruments plus 1 AO system at each 8m telescope. It is incorporating a new facility high resolution spectrograph, building a major workhorse multi-channel instrument for transient sources follow up, and designing a new multi-conjugate AO system. We also run three major upgrades of workhorse instruments and a long-term program to support user motivated upgrades. This paper provides a summary of results of the last three years of the instrument upgrades program and an update on our strategy to keep our instrumentation suite competitive.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信