{"title":"基于em工厂的装配车间生产线仿真与优化","authors":"Hongying Shan, Lina Li, Yu Yuan, Chuang Wang","doi":"10.1109/IEEM.2018.8607605","DOIUrl":null,"url":null,"abstract":"Taking the dynamic production of a line in the assembly shop of a company's rear axle as an example, the on-site investigation confirmed the basic data and analyzed the assembly process. Em-plant software was used to model the dynamic simulation of each station on the assembly line. According to the simulation results, the bottleneck process is improved, and combined with ECRS principles in lean production, it is eliminate, combine, rearrange and simplify. Under the actual production conditions, an optimization scheme was proposed. After the improvement plan was implemented, the simulation results showed that the production capacity was significantly improved, the assembly line imbalance was improved, and the company's efficiency was improved.","PeriodicalId":119238,"journal":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Simulation and Optimization of Production Line in Em-plant based Assembly Workshop\",\"authors\":\"Hongying Shan, Lina Li, Yu Yuan, Chuang Wang\",\"doi\":\"10.1109/IEEM.2018.8607605\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Taking the dynamic production of a line in the assembly shop of a company's rear axle as an example, the on-site investigation confirmed the basic data and analyzed the assembly process. Em-plant software was used to model the dynamic simulation of each station on the assembly line. According to the simulation results, the bottleneck process is improved, and combined with ECRS principles in lean production, it is eliminate, combine, rearrange and simplify. Under the actual production conditions, an optimization scheme was proposed. After the improvement plan was implemented, the simulation results showed that the production capacity was significantly improved, the assembly line imbalance was improved, and the company's efficiency was improved.\",\"PeriodicalId\":119238,\"journal\":{\"name\":\"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2018.8607605\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2018.8607605","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Simulation and Optimization of Production Line in Em-plant based Assembly Workshop
Taking the dynamic production of a line in the assembly shop of a company's rear axle as an example, the on-site investigation confirmed the basic data and analyzed the assembly process. Em-plant software was used to model the dynamic simulation of each station on the assembly line. According to the simulation results, the bottleneck process is improved, and combined with ECRS principles in lean production, it is eliminate, combine, rearrange and simplify. Under the actual production conditions, an optimization scheme was proposed. After the improvement plan was implemented, the simulation results showed that the production capacity was significantly improved, the assembly line imbalance was improved, and the company's efficiency was improved.