{"title":"飞机线束制造过程仿真与优化","authors":"Pei Gao, Jingqian Wen, Yaoguang Hu","doi":"10.1109/ITAIC.2014.7065111","DOIUrl":null,"url":null,"abstract":"The harness manufacturing is mainly performed by handwork which has become the bottleneck of aircraft development. In order to improve the production efficiency, the characteristics of aircraft harness manufacture were summarized by analyzing the harness production processes. The model of production processes was put forward based on network graph to calculate the standard cycle time. And the actual production cycle was estimated by considering the effects of some uncertain factors. Finally, an optimized scheme, which aiming at promoting the balance of production line, was proposed by improving lineation process and adjusting operating positions. The simulation result in eM-Plant showed that the improvement can effectively shorten the harness production cycle time.","PeriodicalId":111584,"journal":{"name":"2014 IEEE 7th Joint International Information Technology and Artificial Intelligence Conference","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Simulation and optimization of manufacturing process for aircraft harness\",\"authors\":\"Pei Gao, Jingqian Wen, Yaoguang Hu\",\"doi\":\"10.1109/ITAIC.2014.7065111\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The harness manufacturing is mainly performed by handwork which has become the bottleneck of aircraft development. In order to improve the production efficiency, the characteristics of aircraft harness manufacture were summarized by analyzing the harness production processes. The model of production processes was put forward based on network graph to calculate the standard cycle time. And the actual production cycle was estimated by considering the effects of some uncertain factors. Finally, an optimized scheme, which aiming at promoting the balance of production line, was proposed by improving lineation process and adjusting operating positions. The simulation result in eM-Plant showed that the improvement can effectively shorten the harness production cycle time.\",\"PeriodicalId\":111584,\"journal\":{\"name\":\"2014 IEEE 7th Joint International Information Technology and Artificial Intelligence Conference\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE 7th Joint International Information Technology and Artificial Intelligence Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITAIC.2014.7065111\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE 7th Joint International Information Technology and Artificial Intelligence Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITAIC.2014.7065111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

飞机线束的制造以手工为主,已成为飞机发展的瓶颈。为了提高飞机线束的生产效率,通过对飞机线束生产工艺的分析,总结了飞机线束生产的特点。提出了基于网络图的生产过程模型,计算标准周期时间。并考虑了一些不确定因素的影响,对实际生产周期进行了估计。最后,通过改进生产线工艺和调整操作位置,提出了以促进生产线平衡为目标的优化方案。eM-Plant的仿真结果表明,该改进可以有效缩短线束的生产周期。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulation and optimization of manufacturing process for aircraft harness
The harness manufacturing is mainly performed by handwork which has become the bottleneck of aircraft development. In order to improve the production efficiency, the characteristics of aircraft harness manufacture were summarized by analyzing the harness production processes. The model of production processes was put forward based on network graph to calculate the standard cycle time. And the actual production cycle was estimated by considering the effects of some uncertain factors. Finally, an optimized scheme, which aiming at promoting the balance of production line, was proposed by improving lineation process and adjusting operating positions. The simulation result in eM-Plant showed that the improvement can effectively shorten the harness production cycle time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信