维护生产力因素—一个案例研究

H. Calow
{"title":"维护生产力因素—一个案例研究","authors":"H. Calow","doi":"10.1109/ICSM.1991.160338","DOIUrl":null,"url":null,"abstract":"A project is described where maintenance productivity savings of 70% have been made, at the same time, accompanied by service-level improvements. The author describes the changes made and suggests what the underlying productivity factors may be. The organization was changed into three teams initially to separate the support and maintenance activities with a single service desk. A metrics program was implemented using a problem management system to log incoming queries and problems. A program of preventive maintenance was established. Full management control was established with procedures for the maintenance processes and interfaces, including, for example, testing, quality control, configuration management and version control, release management and problem management.<<ETX>>","PeriodicalId":269572,"journal":{"name":"Proceedings. Conference on Software Maintenance 1991","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1991-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Maintenance productivity factors-a case study\",\"authors\":\"H. Calow\",\"doi\":\"10.1109/ICSM.1991.160338\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A project is described where maintenance productivity savings of 70% have been made, at the same time, accompanied by service-level improvements. The author describes the changes made and suggests what the underlying productivity factors may be. The organization was changed into three teams initially to separate the support and maintenance activities with a single service desk. A metrics program was implemented using a problem management system to log incoming queries and problems. A program of preventive maintenance was established. Full management control was established with procedures for the maintenance processes and interfaces, including, for example, testing, quality control, configuration management and version control, release management and problem management.<<ETX>>\",\"PeriodicalId\":269572,\"journal\":{\"name\":\"Proceedings. Conference on Software Maintenance 1991\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. Conference on Software Maintenance 1991\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSM.1991.160338\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Conference on Software Maintenance 1991","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.1991.160338","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

摘要

本文描述了一个项目,在此项目中,维护生产力节省了70%,同时服务水平也得到了提高。作者描述了这些变化,并提出了潜在的生产力因素。该组织最初改为三个团队,以将支持和维护活动与单个服务台分开。使用问题管理系统实现了一个度量程序,以记录传入的查询和问题。建立了预防性维修方案。完整的管理控制建立在维护过程和接口的程序上,包括,例如,测试,质量控制,配置管理和版本控制,发布管理和问题管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maintenance productivity factors-a case study
A project is described where maintenance productivity savings of 70% have been made, at the same time, accompanied by service-level improvements. The author describes the changes made and suggests what the underlying productivity factors may be. The organization was changed into three teams initially to separate the support and maintenance activities with a single service desk. A metrics program was implemented using a problem management system to log incoming queries and problems. A program of preventive maintenance was established. Full management control was established with procedures for the maintenance processes and interfaces, including, for example, testing, quality control, configuration management and version control, release management and problem management.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信