{"title":"2016年Kaikōura地震后恢复过程中交通韧性特征和增强韧性的措施","authors":"D. Mason, P. Brabhaharan","doi":"10.5459/BNZSEE.54.2.69-81","DOIUrl":null,"url":null,"abstract":"The Ward to Cheviot section of State Highway 1 is a key lifeline transport route that runs through the Kaikōura township. It is a strategically important link in the national state highway network, connecting the North Island via the Wellington-Picton ferry to the city of Christchurch in the South Island. Its strategic importance and vulnerable location between the mountainous Kaikōura range and the Pacific Ocean make it a critical transportation route in the national transport network. The route has been a focus for understanding the resilience of transport networks from as far back as 2000, when this section was used as a pilot study in early research into transport resilience. A further resilience assessment of this section was completed as part of a national state highway resilience study in mid-2016. Subsequently, the Mw 7.8 Kaikōura earthquake struck the northeast of the South Island on 14 November 2016, triggering thousands of large landslides and causing severe disruption to the transport network. The damage and disruption caused by the earthquake was comparable to that assessed in pre-earthquake studies of the resilience of the state highway. Landslides and embankment failures caused the most damage and disruption to the transport infrastructure, with the Main North Line railway closed for over 9 months and State Highway 1 closed for over a year. Post-earthquake landslides and debris flows triggered by storms caused additional damage and disruption during the recovery phase. Post-earthquake assessment of the corridor resilience was carried out to identify measures to enhance resilience as part of the recovery works. These measures included realigning the road and rail away from the steep hillsides, engineered works to reduce the potential for slope failure, and engineered works to reduce the potential for inundation of the corridor. The resilience assessments also enabled tactical and operational measures to be put in place to ensure safety while allowing the recovery operations to proceed in the context of enhanced risk associated with storm events and potential aftershocks.","PeriodicalId":343472,"journal":{"name":"Bulletin of the New Zealand National Society for Earthquake Engineering","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Characterisation of transport resilience and measures to enhance resilience in the recovery after the 2016 Kaikōura earthquake\",\"authors\":\"D. Mason, P. Brabhaharan\",\"doi\":\"10.5459/BNZSEE.54.2.69-81\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Ward to Cheviot section of State Highway 1 is a key lifeline transport route that runs through the Kaikōura township. It is a strategically important link in the national state highway network, connecting the North Island via the Wellington-Picton ferry to the city of Christchurch in the South Island. Its strategic importance and vulnerable location between the mountainous Kaikōura range and the Pacific Ocean make it a critical transportation route in the national transport network. The route has been a focus for understanding the resilience of transport networks from as far back as 2000, when this section was used as a pilot study in early research into transport resilience. A further resilience assessment of this section was completed as part of a national state highway resilience study in mid-2016. Subsequently, the Mw 7.8 Kaikōura earthquake struck the northeast of the South Island on 14 November 2016, triggering thousands of large landslides and causing severe disruption to the transport network. The damage and disruption caused by the earthquake was comparable to that assessed in pre-earthquake studies of the resilience of the state highway. Landslides and embankment failures caused the most damage and disruption to the transport infrastructure, with the Main North Line railway closed for over 9 months and State Highway 1 closed for over a year. Post-earthquake landslides and debris flows triggered by storms caused additional damage and disruption during the recovery phase. Post-earthquake assessment of the corridor resilience was carried out to identify measures to enhance resilience as part of the recovery works. These measures included realigning the road and rail away from the steep hillsides, engineered works to reduce the potential for slope failure, and engineered works to reduce the potential for inundation of the corridor. The resilience assessments also enabled tactical and operational measures to be put in place to ensure safety while allowing the recovery operations to proceed in the context of enhanced risk associated with storm events and potential aftershocks.\",\"PeriodicalId\":343472,\"journal\":{\"name\":\"Bulletin of the New Zealand National Society for Earthquake Engineering\",\"volume\":\"136 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the New Zealand National Society for Earthquake Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5459/BNZSEE.54.2.69-81\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the New Zealand National Society for Earthquake Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5459/BNZSEE.54.2.69-81","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

1号国道沃德至切维奥特路段是贯穿Kaikōura镇的重要生命线交通路线。它是国家公路网中具有重要战略意义的一环,通过惠灵顿-皮克顿渡轮将北岛连接到南岛的克赖斯特彻奇市。它的战略重要性和脆弱的地理位置介于多山的Kaikōura山脉和太平洋之间,使其成为国家运输网络中的关键运输路线。早在2000年,这条路线就成为了了解交通网络弹性的焦点,当时这一部分被用作交通弹性早期研究的试点研究。2016年中期,作为国家公路弹性研究的一部分,对该路段进行了进一步的弹性评估。随后,2016年11月14日,7.8级Kaikōura地震袭击了南岛东北部,引发了数千次大型山体滑坡,并对交通网络造成严重破坏。地震造成的破坏和破坏与地震前对国道恢复力的研究评估相当。山体滑坡和路堤破裂对交通基础设施造成了最严重的破坏和破坏,主要的北线铁路关闭了9个多月,1号国道关闭了一年多。震后风暴引发的滑坡和泥石流在恢复阶段造成了额外的破坏和破坏。地震后对走廊的恢复能力进行了评估,以确定增强恢复能力的措施,作为恢复工作的一部分。这些措施包括重新调整道路和铁路,使其远离陡峭的山坡,进行工程以减少斜坡破坏的可能性,以及进行工程以减少走廊被水淹没的可能性。恢复力评估还有助于制定战术和行动措施,以确保安全,同时使恢复行动能够在风暴事件和潜在余震风险增加的情况下进行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Characterisation of transport resilience and measures to enhance resilience in the recovery after the 2016 Kaikōura earthquake
The Ward to Cheviot section of State Highway 1 is a key lifeline transport route that runs through the Kaikōura township. It is a strategically important link in the national state highway network, connecting the North Island via the Wellington-Picton ferry to the city of Christchurch in the South Island. Its strategic importance and vulnerable location between the mountainous Kaikōura range and the Pacific Ocean make it a critical transportation route in the national transport network. The route has been a focus for understanding the resilience of transport networks from as far back as 2000, when this section was used as a pilot study in early research into transport resilience. A further resilience assessment of this section was completed as part of a national state highway resilience study in mid-2016. Subsequently, the Mw 7.8 Kaikōura earthquake struck the northeast of the South Island on 14 November 2016, triggering thousands of large landslides and causing severe disruption to the transport network. The damage and disruption caused by the earthquake was comparable to that assessed in pre-earthquake studies of the resilience of the state highway. Landslides and embankment failures caused the most damage and disruption to the transport infrastructure, with the Main North Line railway closed for over 9 months and State Highway 1 closed for over a year. Post-earthquake landslides and debris flows triggered by storms caused additional damage and disruption during the recovery phase. Post-earthquake assessment of the corridor resilience was carried out to identify measures to enhance resilience as part of the recovery works. These measures included realigning the road and rail away from the steep hillsides, engineered works to reduce the potential for slope failure, and engineered works to reduce the potential for inundation of the corridor. The resilience assessments also enabled tactical and operational measures to be put in place to ensure safety while allowing the recovery operations to proceed in the context of enhanced risk associated with storm events and potential aftershocks.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信