K. Zografos, C. Douligeris, L. Chaoxi, G. Develekos
{"title":"基于应急响应操作优化的配电系统可靠性分析与优化","authors":"K. Zografos, C. Douligeris, L. Chaoxi, G. Develekos","doi":"10.1109/APT.1993.673901","DOIUrl":null,"url":null,"abstract":"A BST.RA CT Service unavailability in an electric utility company depends on tlie frequency arid the duration of tlic service interruptions. In this paper, we deal wit11 the initiirnization of the duration of tlie interruption by optimizing tlie emergency response operations capabililies of an electric utility. First, we analyze data 011 service unavailabilidy and deployment of emergency response units and then we present a model for tlie optimization of tliese operations. Tlic model consists of a districting and a simulation part. We focus our attcntion in this paper on tlie siiiiulotion part and its capabilities. Several case studies are prcsented to sliow the possible irnprovernciits if our niotlcl is used.","PeriodicalId":241767,"journal":{"name":"Proceedings. Joint International Power Conference Athens Power Tech,","volume":"2010 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Analysis And Optimization Of Distribution System Reliability Through The Optimization Of Emergency Response Operations\",\"authors\":\"K. Zografos, C. Douligeris, L. Chaoxi, G. Develekos\",\"doi\":\"10.1109/APT.1993.673901\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A BST.RA CT Service unavailability in an electric utility company depends on tlie frequency arid the duration of tlic service interruptions. In this paper, we deal wit11 the initiirnization of the duration of tlie interruption by optimizing tlie emergency response operations capabililies of an electric utility. First, we analyze data 011 service unavailabilidy and deployment of emergency response units and then we present a model for tlie optimization of tliese operations. Tlic model consists of a districting and a simulation part. We focus our attcntion in this paper on tlie siiiiulotion part and its capabilities. Several case studies are prcsented to sliow the possible irnprovernciits if our niotlcl is used.\",\"PeriodicalId\":241767,\"journal\":{\"name\":\"Proceedings. Joint International Power Conference Athens Power Tech,\",\"volume\":\"2010 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. Joint International Power Conference Athens Power Tech,\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APT.1993.673901\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Joint International Power Conference Athens Power Tech,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APT.1993.673901","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis And Optimization Of Distribution System Reliability Through The Optimization Of Emergency Response Operations
A BST.RA CT Service unavailability in an electric utility company depends on tlie frequency arid the duration of tlic service interruptions. In this paper, we deal wit11 the initiirnization of the duration of tlie interruption by optimizing tlie emergency response operations capabililies of an electric utility. First, we analyze data 011 service unavailabilidy and deployment of emergency response units and then we present a model for tlie optimization of tliese operations. Tlic model consists of a districting and a simulation part. We focus our attcntion in this paper on tlie siiiiulotion part and its capabilities. Several case studies are prcsented to sliow the possible irnprovernciits if our niotlcl is used.