一种用于保护协调分析的三相故障电流计算方法

K. Saleh, H. Zeineldin, A. Al-Hinai
{"title":"一种用于保护协调分析的三相故障电流计算方法","authors":"K. Saleh, H. Zeineldin, A. Al-Hinai","doi":"10.1109/TDC.2014.6863444","DOIUrl":null,"url":null,"abstract":"A reliable fault current calculation method is required to perform precise protection coordination analysis. The conventional short circuit calculation method is not valid for distribution power systems that are equipped with Inverter-Based Distributed Generation (IBDG) units. This paper proposes a new simple method based on the superposition theorem that calculates the three-phase fault currents for meshed distribution system in the presence of IBDG units. The proposed method is tested on the power distribution system of IEEE 14-bus with three IBDG units. The proposed method achieves good accuracy when compared to the results of a transient model of the test system. Moreover, the three-phase fault currents computed by the proposed method were used as part of the protection coordination problem. The protection coordination problem is formulated as a constrained non-linear programming problem and solved to determine the optimal relay settings.","PeriodicalId":161074,"journal":{"name":"2014 IEEE PES T&D Conference and Exposition","volume":"139 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A three-phase fault currents calculation method used for protection coordination analysis\",\"authors\":\"K. Saleh, H. Zeineldin, A. Al-Hinai\",\"doi\":\"10.1109/TDC.2014.6863444\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A reliable fault current calculation method is required to perform precise protection coordination analysis. The conventional short circuit calculation method is not valid for distribution power systems that are equipped with Inverter-Based Distributed Generation (IBDG) units. This paper proposes a new simple method based on the superposition theorem that calculates the three-phase fault currents for meshed distribution system in the presence of IBDG units. The proposed method is tested on the power distribution system of IEEE 14-bus with three IBDG units. The proposed method achieves good accuracy when compared to the results of a transient model of the test system. Moreover, the three-phase fault currents computed by the proposed method were used as part of the protection coordination problem. The protection coordination problem is formulated as a constrained non-linear programming problem and solved to determine the optimal relay settings.\",\"PeriodicalId\":161074,\"journal\":{\"name\":\"2014 IEEE PES T&D Conference and Exposition\",\"volume\":\"139 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE PES T&D Conference and Exposition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2014.6863444\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE PES T&D Conference and Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2014.6863444","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

要进行精确的保护协调分析,需要可靠的故障电流计算方法。传统的短路计算方法不适用于配置了逆变器分布式发电机组的配电系统。本文提出了一种基于叠加定理的电网三相故障电流计算新方法。该方法在IEEE 14总线的3台IBDG配电系统上进行了测试。与测试系统的暂态模型结果比较,该方法具有较好的精度。并将该方法计算的三相故障电流作为保护协调问题的一部分。将保护协调问题表述为约束非线性规划问题,并求解以确定继电器的最佳整定值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A three-phase fault currents calculation method used for protection coordination analysis
A reliable fault current calculation method is required to perform precise protection coordination analysis. The conventional short circuit calculation method is not valid for distribution power systems that are equipped with Inverter-Based Distributed Generation (IBDG) units. This paper proposes a new simple method based on the superposition theorem that calculates the three-phase fault currents for meshed distribution system in the presence of IBDG units. The proposed method is tested on the power distribution system of IEEE 14-bus with three IBDG units. The proposed method achieves good accuracy when compared to the results of a transient model of the test system. Moreover, the three-phase fault currents computed by the proposed method were used as part of the protection coordination problem. The protection coordination problem is formulated as a constrained non-linear programming problem and solved to determine the optimal relay settings.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信