2003年意大利大停电

A. Berizzi
{"title":"2003年意大利大停电","authors":"A. Berizzi","doi":"10.1109/PES.2004.1373159","DOIUrl":null,"url":null,"abstract":"On September 28th, 2003, at 3:01 a.m., a fault on the Swiss power system caused the overloading of two Swiss internal lines close to the Italian border. The interconnection lines were heavily loaded by the large power import and the coordination between the system operators was not sufficient to mitigate the overload. The consequent loss of those important branches caused cascading outages of the lines interconnecting the Italian system and the remaining part of the UCTE (Union for the Coordination of the Transmission of Electricity) system. This resulted in a very sudden loss of synchronism between the Italian system and the UCTE grids, causing the loss of the whole import. The consequent power unbalance caused the frequency in Italy to decline; the automatic load shedding procedure was not able to shed load enough to balance the generation and the load, and this resulted in the blackout. The paper provides a short description of the pre-fault system operation and of the main events that triggered the blackout, identifying some of the main causes that resulted in the separation of the Italian system and the blackout. In addition, issues related to the misoperation of the Italian automatic procedure to prevent the blackout are discussed.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"125","resultStr":"{\"title\":\"The Italian 2003 blackout\",\"authors\":\"A. Berizzi\",\"doi\":\"10.1109/PES.2004.1373159\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"On September 28th, 2003, at 3:01 a.m., a fault on the Swiss power system caused the overloading of two Swiss internal lines close to the Italian border. The interconnection lines were heavily loaded by the large power import and the coordination between the system operators was not sufficient to mitigate the overload. The consequent loss of those important branches caused cascading outages of the lines interconnecting the Italian system and the remaining part of the UCTE (Union for the Coordination of the Transmission of Electricity) system. This resulted in a very sudden loss of synchronism between the Italian system and the UCTE grids, causing the loss of the whole import. The consequent power unbalance caused the frequency in Italy to decline; the automatic load shedding procedure was not able to shed load enough to balance the generation and the load, and this resulted in the blackout. The paper provides a short description of the pre-fault system operation and of the main events that triggered the blackout, identifying some of the main causes that resulted in the separation of the Italian system and the blackout. In addition, issues related to the misoperation of the Italian automatic procedure to prevent the blackout are discussed.\",\"PeriodicalId\":236779,\"journal\":{\"name\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"125\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2004.1373159\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 125

摘要

2003年9月28日凌晨3点01分,瑞士电力系统出现故障,导致靠近意大利边境的两条瑞士内线过载。大输入电力对互联线路的负荷较大,系统操作者之间的协调不足以缓解过载。这些重要分支的损失导致连接意大利系统和协调电力传输联盟(UCTE)系统其余部分的线路相继中断。这导致意大利系统和UCTE电网之间的同步性突然丧失,导致整个进口的损失。随之而来的权力不平衡导致意大利的频率下降;自动减载程序无法实现发电量和负荷的平衡,导致停电。本文简要描述了故障前的系统运行和引发停电的主要事件,确定了导致意大利系统与停电分离的一些主要原因。此外,还讨论了意大利自动程序防止停电的误操作问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Italian 2003 blackout
On September 28th, 2003, at 3:01 a.m., a fault on the Swiss power system caused the overloading of two Swiss internal lines close to the Italian border. The interconnection lines were heavily loaded by the large power import and the coordination between the system operators was not sufficient to mitigate the overload. The consequent loss of those important branches caused cascading outages of the lines interconnecting the Italian system and the remaining part of the UCTE (Union for the Coordination of the Transmission of Electricity) system. This resulted in a very sudden loss of synchronism between the Italian system and the UCTE grids, causing the loss of the whole import. The consequent power unbalance caused the frequency in Italy to decline; the automatic load shedding procedure was not able to shed load enough to balance the generation and the load, and this resulted in the blackout. The paper provides a short description of the pre-fault system operation and of the main events that triggered the blackout, identifying some of the main causes that resulted in the separation of the Italian system and the blackout. In addition, issues related to the misoperation of the Italian automatic procedure to prevent the blackout are discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信