增材制造大规模定制生产计划:构建方向确定,二维包装和调度

Yosep Oh, Chi Zhou, S. Behdad
{"title":"增材制造大规模定制生产计划:构建方向确定,二维包装和调度","authors":"Yosep Oh, Chi Zhou, S. Behdad","doi":"10.1115/DETC2018-85639","DOIUrl":null,"url":null,"abstract":"The efficient production planning of Additively Manufactured (AM) parts is a key point for industry-scale adoption of AM. This study develops an AM-based production plan for the case of manufacturing a significant number of parts with different shapes and sizes by multiple machines with the ultimate purpose of reducing the cycle time. The proposed AM-based production planning includes three main steps: (1) determination of build orientation; (2) 2D packing of parts within the limited workspace of AM machines; and (3) scheduling parts on multiple AM machines. For making decision about build orientation, two main policies are considered: (1) laying policy in which the focus is on reducing the height of parts; and (2) standing policy which aims at minimizing the projection area on the tray to reduce the number of jobs. A heuristic algorithm is suggested to solve 2D packing and scheduling problems. A numerical example is conducted to identify which policy is more preferred in terms of cycle time. As a result, the standing policy is more preferred than the laying policy as the number of parts increases. In the case of testing 3,000 parts, the cycle time of standing policy is about 6% shorter than laying policy.","PeriodicalId":138856,"journal":{"name":"Volume 2A: 44th Design Automation Conference","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":"{\"title\":\"Production Planning for Mass Customization in Additive Manufacturing: Build Orientation Determination, 2D Packing and Scheduling\",\"authors\":\"Yosep Oh, Chi Zhou, S. Behdad\",\"doi\":\"10.1115/DETC2018-85639\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The efficient production planning of Additively Manufactured (AM) parts is a key point for industry-scale adoption of AM. This study develops an AM-based production plan for the case of manufacturing a significant number of parts with different shapes and sizes by multiple machines with the ultimate purpose of reducing the cycle time. The proposed AM-based production planning includes three main steps: (1) determination of build orientation; (2) 2D packing of parts within the limited workspace of AM machines; and (3) scheduling parts on multiple AM machines. For making decision about build orientation, two main policies are considered: (1) laying policy in which the focus is on reducing the height of parts; and (2) standing policy which aims at minimizing the projection area on the tray to reduce the number of jobs. A heuristic algorithm is suggested to solve 2D packing and scheduling problems. A numerical example is conducted to identify which policy is more preferred in terms of cycle time. As a result, the standing policy is more preferred than the laying policy as the number of parts increases. In the case of testing 3,000 parts, the cycle time of standing policy is about 6% shorter than laying policy.\",\"PeriodicalId\":138856,\"journal\":{\"name\":\"Volume 2A: 44th Design Automation Conference\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"21\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 2A: 44th Design Automation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/DETC2018-85639\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 2A: 44th Design Automation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/DETC2018-85639","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

摘要

增材制造(AM)零件的高效生产计划是增材制造工业规模采用的关键。本研究针对多台机器制造大量不同形状和尺寸零件的情况,以减少周期时间为最终目的,开发了一种基于am的生产计划。提出的基于am的生产计划包括三个主要步骤:(1)确定构建方向;(2)在增材制造机器有限的工作空间内对零件进行二维包装;(3)在多台AM机上调度零件。在确定建筑方位时,主要考虑两种策略:(1)铺设策略,以降低部件高度为重点;(2)站立政策,旨在尽量减少托盘上的投影面积,以减少工作岗位的数量。提出了一种求解二维包装调度问题的启发式算法。通过一个数值例子来确定哪种策略在周期时间方面更受欢迎。因此,随着零件数量的增加,站立策略比铺设策略更受青睐。在测试3000个零件的情况下,备用策略的周期时间比铺设策略的周期时间短6%左右。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Production Planning for Mass Customization in Additive Manufacturing: Build Orientation Determination, 2D Packing and Scheduling
The efficient production planning of Additively Manufactured (AM) parts is a key point for industry-scale adoption of AM. This study develops an AM-based production plan for the case of manufacturing a significant number of parts with different shapes and sizes by multiple machines with the ultimate purpose of reducing the cycle time. The proposed AM-based production planning includes three main steps: (1) determination of build orientation; (2) 2D packing of parts within the limited workspace of AM machines; and (3) scheduling parts on multiple AM machines. For making decision about build orientation, two main policies are considered: (1) laying policy in which the focus is on reducing the height of parts; and (2) standing policy which aims at minimizing the projection area on the tray to reduce the number of jobs. A heuristic algorithm is suggested to solve 2D packing and scheduling problems. A numerical example is conducted to identify which policy is more preferred in terms of cycle time. As a result, the standing policy is more preferred than the laying policy as the number of parts increases. In the case of testing 3,000 parts, the cycle time of standing policy is about 6% shorter than laying policy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信