隧道掘进中的数字地基模型。现状、机会和风险

J. Weil
{"title":"隧道掘进中的数字地基模型。现状、机会和风险","authors":"J. Weil","doi":"10.1002/geot.201900078","DOIUrl":null,"url":null,"abstract":"Digital data acquisition and processing in geology and geotechnics are essential in all phases of a tunnelling project. This article describes typical work flows of engineering geology and the digital tools used, and discusses the requirements, chances and risks associated with the integration of ground models into BIM projects. The handling of factual data is depicted, but the main topic is the development and application of interpreted geological models for tunnelling. Aspects like the transferred information and its localisation, uncertainty of a prediction and requirements for formats, data structures and software environment are discussed. Efficient exchange and long‐term usability of information demands clear definitions for the specialist models and use cases to be covered.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Digital ground models in tunnelling – Status, chances and risks\",\"authors\":\"J. Weil\",\"doi\":\"10.1002/geot.201900078\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Digital data acquisition and processing in geology and geotechnics are essential in all phases of a tunnelling project. This article describes typical work flows of engineering geology and the digital tools used, and discusses the requirements, chances and risks associated with the integration of ground models into BIM projects. The handling of factual data is depicted, but the main topic is the development and application of interpreted geological models for tunnelling. Aspects like the transferred information and its localisation, uncertainty of a prediction and requirements for formats, data structures and software environment are discussed. Efficient exchange and long‐term usability of information demands clear definitions for the specialist models and use cases to be covered.\",\"PeriodicalId\":170042,\"journal\":{\"name\":\"Geomechanics and Tunnelling\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanics and Tunnelling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/geot.201900078\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201900078","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

地质和岩土工程中的数字数据采集和处理在隧道工程的各个阶段都是必不可少的。本文描述了工程地质的典型工作流程和所使用的数字工具,并讨论了将地面模型集成到BIM项目中的要求、机会和风险。描述了实际数据的处理,但主要主题是隧道掘进解释地质模型的发展和应用。讨论了传输信息及其定位、预测的不确定性以及对格式、数据结构和软件环境的要求等方面。信息的有效交换和长期可用性要求对所涵盖的专家模型和用例有明确的定义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Digital ground models in tunnelling – Status, chances and risks
Digital data acquisition and processing in geology and geotechnics are essential in all phases of a tunnelling project. This article describes typical work flows of engineering geology and the digital tools used, and discusses the requirements, chances and risks associated with the integration of ground models into BIM projects. The handling of factual data is depicted, but the main topic is the development and application of interpreted geological models for tunnelling. Aspects like the transferred information and its localisation, uncertainty of a prediction and requirements for formats, data structures and software environment are discussed. Efficient exchange and long‐term usability of information demands clear definitions for the specialist models and use cases to be covered.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信