F. Vallée, F. Vallée, J. Lobry, O. Deblecker
{"title":"经济调度下输电系统充分性研究背景下风电整合的影响:比利时案例的应用","authors":"F. Vallée, F. Vallée, J. Lobry, O. Deblecker","doi":"10.1109/ICCEP.2011.6036320","DOIUrl":null,"url":null,"abstract":"In this paper, a strategy is proposed in order to introduce in a realistic way wind generation into a HLII (bulk power system) non sequential Monte Carlo adequacy study with economic dispatch. Thanks to the implemented solution, wind generation is consequently confronted to operational constraints related to high powered thermal units, nuclear parks or thermal machines with technical minimum value. Moreover, during each simulated system state, a DC load flow is also calculated in order to evaluate reinforcements optimizing the large scale integration of wind power production. The simulation tool modified during the present work is called Scanner© and is the property of Tractebel Engineering (Gaz de France - Suez) company. Finally, in order to fully access the large offshore wind potential in the North Sea, the proposed simulation tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of wind power integration in the context of transmission systems adequacy studies with economic dispatch: Application to the Belgian case\",\"authors\":\"F. Vallée, F. Vallée, J. Lobry, O. Deblecker\",\"doi\":\"10.1109/ICCEP.2011.6036320\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a strategy is proposed in order to introduce in a realistic way wind generation into a HLII (bulk power system) non sequential Monte Carlo adequacy study with economic dispatch. Thanks to the implemented solution, wind generation is consequently confronted to operational constraints related to high powered thermal units, nuclear parks or thermal machines with technical minimum value. Moreover, during each simulated system state, a DC load flow is also calculated in order to evaluate reinforcements optimizing the large scale integration of wind power production. The simulation tool modified during the present work is called Scanner© and is the property of Tractebel Engineering (Gaz de France - Suez) company. Finally, in order to fully access the large offshore wind potential in the North Sea, the proposed simulation tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network.\",\"PeriodicalId\":403158,\"journal\":{\"name\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCEP.2011.6036320\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036320","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Impact of wind power integration in the context of transmission systems adequacy studies with economic dispatch: Application to the Belgian case
In this paper, a strategy is proposed in order to introduce in a realistic way wind generation into a HLII (bulk power system) non sequential Monte Carlo adequacy study with economic dispatch. Thanks to the implemented solution, wind generation is consequently confronted to operational constraints related to high powered thermal units, nuclear parks or thermal machines with technical minimum value. Moreover, during each simulated system state, a DC load flow is also calculated in order to evaluate reinforcements optimizing the large scale integration of wind power production. The simulation tool modified during the present work is called Scanner© and is the property of Tractebel Engineering (Gaz de France - Suez) company. Finally, in order to fully access the large offshore wind potential in the North Sea, the proposed simulation tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network.