调查基础设施课程BIM的辍学率

R. Puust, E. Witt, I. Lill, R. Liias
{"title":"调查基础设施课程BIM的辍学率","authors":"R. Puust, E. Witt, I. Lill, R. Liias","doi":"10.35490/EC3.2019.149","DOIUrl":null,"url":null,"abstract":"This research examines how personal time management relates to successful course completion or dropping-out from a high intensity building information modelling (BIM) e-learning course. The course has been developed during 2017-2018 and uses peer instruction to engage students with the intention of improving their performance. Students' activity data were captured and analysed according to their study groups and suggested study module completion dates. The findings suggest that distance learners had a higher drop-out rate than study program students and that lagging the suggested study module completion dates did not necessarily lead to dropping-out. This paper represents a first step in ongoing research to understand the effectiveness of peer instruction in high intensity BIM courses.","PeriodicalId":126601,"journal":{"name":"Proceedings of the 2019 European Conference on Computing in Construction","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Investigating the drop-out rate from a BIM for infrastructure course\",\"authors\":\"R. Puust, E. Witt, I. Lill, R. Liias\",\"doi\":\"10.35490/EC3.2019.149\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research examines how personal time management relates to successful course completion or dropping-out from a high intensity building information modelling (BIM) e-learning course. The course has been developed during 2017-2018 and uses peer instruction to engage students with the intention of improving their performance. Students' activity data were captured and analysed according to their study groups and suggested study module completion dates. The findings suggest that distance learners had a higher drop-out rate than study program students and that lagging the suggested study module completion dates did not necessarily lead to dropping-out. This paper represents a first step in ongoing research to understand the effectiveness of peer instruction in high intensity BIM courses.\",\"PeriodicalId\":126601,\"journal\":{\"name\":\"Proceedings of the 2019 European Conference on Computing in Construction\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2019 European Conference on Computing in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35490/EC3.2019.149\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2019 European Conference on Computing in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35490/EC3.2019.149","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究考察了个人时间管理与高强度建筑信息模型(BIM)电子学习课程的成功完成或退出之间的关系。该课程是在2017-2018年期间开发的,采用同伴指导来吸引学生,以提高他们的表现。根据学生的学习小组和建议的学习模块完成日期,收集和分析学生的活动数据。研究结果表明,远程学习者的辍学率高于学习计划的学生,落后于建议的学习模块完成日期并不一定导致辍学。本文代表了正在进行的研究的第一步,以了解高强度BIM课程中同伴指导的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigating the drop-out rate from a BIM for infrastructure course
This research examines how personal time management relates to successful course completion or dropping-out from a high intensity building information modelling (BIM) e-learning course. The course has been developed during 2017-2018 and uses peer instruction to engage students with the intention of improving their performance. Students' activity data were captured and analysed according to their study groups and suggested study module completion dates. The findings suggest that distance learners had a higher drop-out rate than study program students and that lagging the suggested study module completion dates did not necessarily lead to dropping-out. This paper represents a first step in ongoing research to understand the effectiveness of peer instruction in high intensity BIM courses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信