Hendro Purnomo, R. Prastowo, Muhammad Hafizh Hibullah, Setyo Pambudi
{"title":"andesit资源评估采用了一种正规克里克方法,以评估爪哇岛中部Zlaw Group Boyolali的geolioption","authors":"Hendro Purnomo, R. Prastowo, Muhammad Hafizh Hibullah, Setyo Pambudi","doi":"10.30556/jtmb.vol19.no1.2023.1336","DOIUrl":null,"url":null,"abstract":"PT. Zlaw Group Boyolali is a company of andesite mining located in Wates Hamlet, Seboto Village, Gladagsari District, Boyolali Regency, Central Java Province. The potential of andesite in the area is encouraging and the absence of supporting data about the distribution and resources of andesite brings PT. Zlaw Group Boyolali to conducting exploration. The objective of this study is to analyze the interpretation of geoelectric measurements of the dipole-dipole configuration and calculate the volume of andesite resources based on geostatistics optimization at the research location and compare the estimation results with previous studies. The research activity was carried out by measuring 2-dimensional geoelectrical resistivity using a dipole-dipole configuration of 12 passes, which covered 100% of the research area. Based on the results of geostatistics optimization, parameters obtained include: nugget 0.224053, sill 0.641390, range 67.749, major/semi-major 1.188, and major/minor 2.073. Soil volume is 1,245,750 m3 with a tonnage of 3,238,950 tons, a weathered andesite volume of 999,656 m3 with a tonnage of 2,599,106 tons, and fresh andesite volume of 1,437,925 m3 with a tonnage of 3,738,605 tons.","PeriodicalId":118039,"journal":{"name":"Jurnal Teknologi Mineral dan Batubara","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimasi sumberdaya andesit menggunakan metode ordinary kriging berdasarkan pengukuran geolistrik di PT. Zlaw Group Boyolali, Jawa Tengah\",\"authors\":\"Hendro Purnomo, R. Prastowo, Muhammad Hafizh Hibullah, Setyo Pambudi\",\"doi\":\"10.30556/jtmb.vol19.no1.2023.1336\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. Zlaw Group Boyolali is a company of andesite mining located in Wates Hamlet, Seboto Village, Gladagsari District, Boyolali Regency, Central Java Province. The potential of andesite in the area is encouraging and the absence of supporting data about the distribution and resources of andesite brings PT. Zlaw Group Boyolali to conducting exploration. The objective of this study is to analyze the interpretation of geoelectric measurements of the dipole-dipole configuration and calculate the volume of andesite resources based on geostatistics optimization at the research location and compare the estimation results with previous studies. The research activity was carried out by measuring 2-dimensional geoelectrical resistivity using a dipole-dipole configuration of 12 passes, which covered 100% of the research area. Based on the results of geostatistics optimization, parameters obtained include: nugget 0.224053, sill 0.641390, range 67.749, major/semi-major 1.188, and major/minor 2.073. Soil volume is 1,245,750 m3 with a tonnage of 3,238,950 tons, a weathered andesite volume of 999,656 m3 with a tonnage of 2,599,106 tons, and fresh andesite volume of 1,437,925 m3 with a tonnage of 3,738,605 tons.\",\"PeriodicalId\":118039,\"journal\":{\"name\":\"Jurnal Teknologi Mineral dan Batubara\",\"volume\":\"70 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknologi Mineral dan Batubara\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30556/jtmb.vol19.no1.2023.1336\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknologi Mineral dan Batubara","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30556/jtmb.vol19.no1.2023.1336","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
PT. Zlaw Group Boyolali是一家位于中爪哇省Boyolali县Gladagsari区Seboto村Wates Hamlet的安山岩采矿公司。该地区安山岩的潜力令人鼓舞,由于缺乏关于安山岩分布和资源的支持数据,因此PT. Zlaw Group Boyolali进行了勘探。本研究的目的是分析偶极-偶极配置地电测量数据的解释,并基于地统计学优化计算研究点安山岩资源量,并将估算结果与前人研究结果进行比较。研究活动通过使用12道偶极-偶极配置测量二维地电阻率来进行,覆盖了100%的研究区域。根据地质统计优化结果,得到的参数为:块金0.224053,矿体0.641390,极差67.749,主要/半主要1.188,主要/次要2.073。土壤体积1245750立方米,吨位3238950吨;风化安山岩体积999656立方米,吨位25999106吨;新鲜安山岩体积1437925立方米,吨位3738605吨。
Estimasi sumberdaya andesit menggunakan metode ordinary kriging berdasarkan pengukuran geolistrik di PT. Zlaw Group Boyolali, Jawa Tengah
PT. Zlaw Group Boyolali is a company of andesite mining located in Wates Hamlet, Seboto Village, Gladagsari District, Boyolali Regency, Central Java Province. The potential of andesite in the area is encouraging and the absence of supporting data about the distribution and resources of andesite brings PT. Zlaw Group Boyolali to conducting exploration. The objective of this study is to analyze the interpretation of geoelectric measurements of the dipole-dipole configuration and calculate the volume of andesite resources based on geostatistics optimization at the research location and compare the estimation results with previous studies. The research activity was carried out by measuring 2-dimensional geoelectrical resistivity using a dipole-dipole configuration of 12 passes, which covered 100% of the research area. Based on the results of geostatistics optimization, parameters obtained include: nugget 0.224053, sill 0.641390, range 67.749, major/semi-major 1.188, and major/minor 2.073. Soil volume is 1,245,750 m3 with a tonnage of 3,238,950 tons, a weathered andesite volume of 999,656 m3 with a tonnage of 2,599,106 tons, and fresh andesite volume of 1,437,925 m3 with a tonnage of 3,738,605 tons.