{"title":"识别、评估bim技术在未完工建筑工程改造建模中的缺点和潜在可能性","authors":"V. Donenko, T. Lukianova","doi":"10.30838/j.bpsacea.2312.221019.25.518","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":140933,"journal":{"name":"Bulletin of Prydniprovs’ka State Academy of Civil Engineering and Architecture","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Identification, assessment of disadvantages and potential possibilities of implementing BIM-technologies for modeling the renovation of unfinished building constructions projects\",\"authors\":\"V. Donenko, T. Lukianova\",\"doi\":\"10.30838/j.bpsacea.2312.221019.25.518\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":140933,\"journal\":{\"name\":\"Bulletin of Prydniprovs’ka State Academy of Civil Engineering and Architecture\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Prydniprovs’ka State Academy of Civil Engineering and Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30838/j.bpsacea.2312.221019.25.518\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Prydniprovs’ka State Academy of Civil Engineering and Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30838/j.bpsacea.2312.221019.25.518","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Identification, assessment of disadvantages and potential possibilities of implementing BIM-technologies for modeling the renovation of unfinished building constructions projects