利用局部测量改进天气预报的预报校正方法

M. Gulin, M. Vašak, J. Matuško
{"title":"利用局部测量改进天气预报的预报校正方法","authors":"M. Gulin, M. Vašak, J. Matuško","doi":"10.1109/EDPE.2015.7325289","DOIUrl":null,"url":null,"abstract":"Weather forecast is a crucial input for prediction of local building consumption and power production profiles in the building's microgrid. E.g., prediction of solar irradiance components and air temperature is used to predict photovoltaic array power production, while air temperature and humidity are often used to predict building consumption during the day. Due to the computation complexity of meteorological models, new prediction sequence becomes available every 6 h at best, and often comes with a nearly 4 h lag. In this paper we develop a linear and nonlinear corrector models to improve weather forecast by using local measurements only. The main motivation behind this approach is to correct prediction sequence by using local measurements as they become available, i.e. prediction sequence is refreshed every 1 h instead of every 6 h. The proposed approach is validated on historical air temperature prediction sequences and actual measurements during 6 months period.","PeriodicalId":246203,"journal":{"name":"2015 International Conference on Electrical Drives and Power Electronics (EDPE)","volume":"135 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Predictor-corrector method for weather forecast improvement using local measurements\",\"authors\":\"M. Gulin, M. Vašak, J. Matuško\",\"doi\":\"10.1109/EDPE.2015.7325289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Weather forecast is a crucial input for prediction of local building consumption and power production profiles in the building's microgrid. E.g., prediction of solar irradiance components and air temperature is used to predict photovoltaic array power production, while air temperature and humidity are often used to predict building consumption during the day. Due to the computation complexity of meteorological models, new prediction sequence becomes available every 6 h at best, and often comes with a nearly 4 h lag. In this paper we develop a linear and nonlinear corrector models to improve weather forecast by using local measurements only. The main motivation behind this approach is to correct prediction sequence by using local measurements as they become available, i.e. prediction sequence is refreshed every 1 h instead of every 6 h. The proposed approach is validated on historical air temperature prediction sequences and actual measurements during 6 months period.\",\"PeriodicalId\":246203,\"journal\":{\"name\":\"2015 International Conference on Electrical Drives and Power Electronics (EDPE)\",\"volume\":\"135 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Electrical Drives and Power Electronics (EDPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EDPE.2015.7325289\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Electrical Drives and Power Electronics (EDPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EDPE.2015.7325289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

天气预报是预测当地建筑消费和建筑微电网电力生产概况的重要输入。例如,预测太阳辐照度成分和空气温度用于预测光伏阵列的发电量,而空气温度和湿度通常用于预测白天的建筑消耗量。由于气象模式的计算复杂性,新的预报序列最多每6小时产生一次,并且往往有近4小时的滞后。在本文中,我们开发了一个线性和非线性校正模型,以提高仅使用局部测量的天气预报。该方法的主要动机是通过使用可用的本地测量数据来纠正预测序列,即预测序列每1小时更新一次,而不是每6小时更新一次。该方法在历史气温预测序列和6个月期间的实际测量数据上进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Predictor-corrector method for weather forecast improvement using local measurements
Weather forecast is a crucial input for prediction of local building consumption and power production profiles in the building's microgrid. E.g., prediction of solar irradiance components and air temperature is used to predict photovoltaic array power production, while air temperature and humidity are often used to predict building consumption during the day. Due to the computation complexity of meteorological models, new prediction sequence becomes available every 6 h at best, and often comes with a nearly 4 h lag. In this paper we develop a linear and nonlinear corrector models to improve weather forecast by using local measurements only. The main motivation behind this approach is to correct prediction sequence by using local measurements as they become available, i.e. prediction sequence is refreshed every 1 h instead of every 6 h. The proposed approach is validated on historical air temperature prediction sequences and actual measurements during 6 months period.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信