R. Millar, B. Sousa, M. Lehtonen, Atte Pihkala, E. Saarijarvi
{"title":"一次变电站和高压故障对城郊中压网络拓扑结构和总成本的影响","authors":"R. Millar, B. Sousa, M. Lehtonen, Atte Pihkala, E. Saarijarvi","doi":"10.1109/POWERENG.2015.7266335","DOIUrl":null,"url":null,"abstract":"The availability of electricity is of paramount importance in urban distribution networks, and one planning consideration is the way medium voltage network is protected against faults in the feeding primary substation or high voltage network. One approach is to provide primary substations with full redundancy, and another is to ensure backup from adjacent primary substations. This paper details the methodology to implement this consideration in a distribution network planning algorithm that has been under development for several years at Aalto University. A case study on a 10 kV suburban network area is demonstrated, comparing the benefit of endowing a GIS primary substation with dual HV busbars rather than just a single busbar, versus forcing backup to be available from the adjacent primary substations.","PeriodicalId":334135,"journal":{"name":"2015 IEEE 5th International Conference on Power Engineering, Energy and Electrical Drives (POWERENG)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of primary substation and HV faults on suburban MV network topology and total costs\",\"authors\":\"R. Millar, B. Sousa, M. Lehtonen, Atte Pihkala, E. Saarijarvi\",\"doi\":\"10.1109/POWERENG.2015.7266335\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The availability of electricity is of paramount importance in urban distribution networks, and one planning consideration is the way medium voltage network is protected against faults in the feeding primary substation or high voltage network. One approach is to provide primary substations with full redundancy, and another is to ensure backup from adjacent primary substations. This paper details the methodology to implement this consideration in a distribution network planning algorithm that has been under development for several years at Aalto University. A case study on a 10 kV suburban network area is demonstrated, comparing the benefit of endowing a GIS primary substation with dual HV busbars rather than just a single busbar, versus forcing backup to be available from the adjacent primary substations.\",\"PeriodicalId\":334135,\"journal\":{\"name\":\"2015 IEEE 5th International Conference on Power Engineering, Energy and Electrical Drives (POWERENG)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-09-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE 5th International Conference on Power Engineering, Energy and Electrical Drives (POWERENG)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERENG.2015.7266335\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 5th International Conference on Power Engineering, Energy and Electrical Drives (POWERENG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERENG.2015.7266335","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Impact of primary substation and HV faults on suburban MV network topology and total costs
The availability of electricity is of paramount importance in urban distribution networks, and one planning consideration is the way medium voltage network is protected against faults in the feeding primary substation or high voltage network. One approach is to provide primary substations with full redundancy, and another is to ensure backup from adjacent primary substations. This paper details the methodology to implement this consideration in a distribution network planning algorithm that has been under development for several years at Aalto University. A case study on a 10 kV suburban network area is demonstrated, comparing the benefit of endowing a GIS primary substation with dual HV busbars rather than just a single busbar, versus forcing backup to be available from the adjacent primary substations.