Leandro Barretiri, Bruno S. Gonçalves, R. M. Lima, J. Dinis-Carvalho
{"title":"MRI等候名单管理中内部生产的优先排序:一个优化模型","authors":"Leandro Barretiri, Bruno S. Gonçalves, R. M. Lima, J. Dinis-Carvalho","doi":"10.1007/978-3-030-78170-5_7","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":398072,"journal":{"name":"Innovations in Industrial Engineering","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prioritizing Internal Production on MRI Waiting List Management: An Optimization Model\",\"authors\":\"Leandro Barretiri, Bruno S. Gonçalves, R. M. Lima, J. Dinis-Carvalho\",\"doi\":\"10.1007/978-3-030-78170-5_7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":398072,\"journal\":{\"name\":\"Innovations in Industrial Engineering\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Innovations in Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-030-78170-5_7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Innovations in Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-78170-5_7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}