{"title":"MMC-HVDC站通电时预插电阻的旁路暂态","authors":"Lina He","doi":"10.1109/PECI.2018.8334981","DOIUrl":null,"url":null,"abstract":"In a modular multilevel converter (MMC) station, a circuit breaker (CB) with a pre-insertion resistor (PIR) is required to be installed to suppress the inrush current due to the saturation of the converter transformer during the energization of the MMC station. The insertion time of the PIR depends on the specific design of the MMC-HVDC projects, usually in the order of seconds. When the PIR is bypassed from the energization circuit, the resulting switching transients can lead the converter transformer to be saturated. The caused high inrush currents are able to endanger the MMC station and reduce the transformer life-cycle. In order to understand the corresponding transients and perform the simulation study, this paper presents a test model, including a MMC station, a HVDC feeder and an external network. Two cases with different bypassing strategies are simulated in this paper to identify an appropriate bypassing time.","PeriodicalId":151630,"journal":{"name":"2018 IEEE Power and Energy Conference at Illinois (PECI)","volume":"869 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bypassing transients of pre-insertion resistor during energization of MMC-HVDC stations\",\"authors\":\"Lina He\",\"doi\":\"10.1109/PECI.2018.8334981\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a modular multilevel converter (MMC) station, a circuit breaker (CB) with a pre-insertion resistor (PIR) is required to be installed to suppress the inrush current due to the saturation of the converter transformer during the energization of the MMC station. The insertion time of the PIR depends on the specific design of the MMC-HVDC projects, usually in the order of seconds. When the PIR is bypassed from the energization circuit, the resulting switching transients can lead the converter transformer to be saturated. The caused high inrush currents are able to endanger the MMC station and reduce the transformer life-cycle. In order to understand the corresponding transients and perform the simulation study, this paper presents a test model, including a MMC station, a HVDC feeder and an external network. Two cases with different bypassing strategies are simulated in this paper to identify an appropriate bypassing time.\",\"PeriodicalId\":151630,\"journal\":{\"name\":\"2018 IEEE Power and Energy Conference at Illinois (PECI)\",\"volume\":\"869 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Power and Energy Conference at Illinois (PECI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PECI.2018.8334981\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Power and Energy Conference at Illinois (PECI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECI.2018.8334981","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在模块化多电平变流器(MMC)站中,需要安装带预插入电阻(PIR)的断路器(CB)来抑制在MMC站通电过程中由于换流变压器饱和而产生的涌流。PIR的插入时间取决于MMC-HVDC项目的具体设计,通常以秒为单位。当PIR从通电电路旁路时,由此产生的开关瞬态可能导致换流变压器饱和。由此产生的高涌流会危及MMC站的安全,降低变压器的使用寿命。为了了解相应的暂态并进行仿真研究,本文提出了一个包括MMC站、HVDC馈线和外网的试验模型。本文对两种不同旁路策略的情况进行了仿真,以确定合适的旁路时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bypassing transients of pre-insertion resistor during energization of MMC-HVDC stations
In a modular multilevel converter (MMC) station, a circuit breaker (CB) with a pre-insertion resistor (PIR) is required to be installed to suppress the inrush current due to the saturation of the converter transformer during the energization of the MMC station. The insertion time of the PIR depends on the specific design of the MMC-HVDC projects, usually in the order of seconds. When the PIR is bypassed from the energization circuit, the resulting switching transients can lead the converter transformer to be saturated. The caused high inrush currents are able to endanger the MMC station and reduce the transformer life-cycle. In order to understand the corresponding transients and perform the simulation study, this paper presents a test model, including a MMC station, a HVDC feeder and an external network. Two cases with different bypassing strategies are simulated in this paper to identify an appropriate bypassing time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信