{"title":"工程和实施RMS工程的DTC度量","authors":"Q. Redman, G. Stratton, E. Casey, Diana Patane","doi":"10.1080/1941658X.2008.10462216","DOIUrl":null,"url":null,"abstract":"Abstract Architecting a product requires a defined set of requirements for the finished product, e.g., size, weight, volume, range, power, color, cost, payload, etc. One very necessary requirement is the anticipated product production cost. Failure to set the production cost requirements at design kick-off allows for unexpected and unacceptable production costs. Previously, all too often, programs were allowing establishment of the production cost goal to slip, or they would wait for their customer to establish it for them. Raytheon Missile Systems’ (RMS) Engineering Directorate has since specified that all development programs will now establish a production cost goal using the Design-to-Cost (DTC) metric described within this article and will monitor their design progress toward meeting this goal. Each program's DTC metric is now collected monthly and reviewed by senior management. This article will focus on the creation of the Design-to-Cost Metric (DTC), its purpose and its use at RMS. The DTC metric is designed to allow business-unit management to quickly review the status of their programs, as to how well the various program designs are progressing with respect to their ability to be produced at the specified value.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Engineering and Implementing RMS Engineering's DTC Metric\",\"authors\":\"Q. Redman, G. Stratton, E. Casey, Diana Patane\",\"doi\":\"10.1080/1941658X.2008.10462216\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Architecting a product requires a defined set of requirements for the finished product, e.g., size, weight, volume, range, power, color, cost, payload, etc. One very necessary requirement is the anticipated product production cost. Failure to set the production cost requirements at design kick-off allows for unexpected and unacceptable production costs. Previously, all too often, programs were allowing establishment of the production cost goal to slip, or they would wait for their customer to establish it for them. Raytheon Missile Systems’ (RMS) Engineering Directorate has since specified that all development programs will now establish a production cost goal using the Design-to-Cost (DTC) metric described within this article and will monitor their design progress toward meeting this goal. Each program's DTC metric is now collected monthly and reviewed by senior management. This article will focus on the creation of the Design-to-Cost Metric (DTC), its purpose and its use at RMS. The DTC metric is designed to allow business-unit management to quickly review the status of their programs, as to how well the various program designs are progressing with respect to their ability to be produced at the specified value.\",\"PeriodicalId\":390877,\"journal\":{\"name\":\"Journal of Cost Analysis and Parametrics\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cost Analysis and Parametrics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/1941658X.2008.10462216\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2008.10462216","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

构建一个产品需要对成品有一组明确的需求,例如,尺寸、重量、体积、范围、功率、颜色、成本、有效载荷等。一个非常必要的要求是预期的产品生产成本。未能在设计开始时设定生产成本要求会导致意外和不可接受的生产成本。以前,通常情况下,程序允许建立生产成本目标,或者他们会等待客户为他们建立成本目标。雷神导弹系统公司(RMS)工程部已经明确指出,所有的开发项目现在将使用本文中描述的设计成本(DTC)度量标准建立一个生产成本目标,并将监控他们的设计进度以实现这一目标。每个项目的DTC指标现在每月收集一次,并由高级管理人员进行审查。本文将重点介绍设计到成本度量(DTC)的创建、它的目的和它在RMS中的使用。DTC度量被设计为允许业务单元管理快速地检查他们的计划的状态,以及各种计划设计的进展情况,以及它们在指定值上产生的能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Engineering and Implementing RMS Engineering's DTC Metric
Abstract Architecting a product requires a defined set of requirements for the finished product, e.g., size, weight, volume, range, power, color, cost, payload, etc. One very necessary requirement is the anticipated product production cost. Failure to set the production cost requirements at design kick-off allows for unexpected and unacceptable production costs. Previously, all too often, programs were allowing establishment of the production cost goal to slip, or they would wait for their customer to establish it for them. Raytheon Missile Systems’ (RMS) Engineering Directorate has since specified that all development programs will now establish a production cost goal using the Design-to-Cost (DTC) metric described within this article and will monitor their design progress toward meeting this goal. Each program's DTC metric is now collected monthly and reviewed by senior management. This article will focus on the creation of the Design-to-Cost Metric (DTC), its purpose and its use at RMS. The DTC metric is designed to allow business-unit management to quickly review the status of their programs, as to how well the various program designs are progressing with respect to their ability to be produced at the specified value.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信