测量时间分辨率对分布式能源关键性能指标的影响:实验分析

M. Pasetti, S. Rinaldi, P. Bellagente, A. Depari, P. Ferrari, A. Flammini, E. Sisinni
{"title":"测量时间分辨率对分布式能源关键性能指标的影响:实验分析","authors":"M. Pasetti, S. Rinaldi, P. Bellagente, A. Depari, P. Ferrari, A. Flammini, E. Sisinni","doi":"10.1109/AMPS50177.2021.9586020","DOIUrl":null,"url":null,"abstract":"The growing presence of Renewable Energy Sources (RESs) is heavily affecting the control and management of distribution grids. Battery Energy Storage Systems (BESSs) are increasingly adopted to mitigate the adverse impacts caused by the uncertainty of RES generators. Most of the existing works in the literature aims at using BESSs to maximize the self-consumption of energy provided by RES generators or focuses on the mitigation of voltage and/or frequency drift effects. More recently, some research works also studied the effects that BESSs have on the active power flows at the Point of Common Coupling (PCC) of prosumers. All these studies are based on the definition of proper energy Key Performance Indicators (KPIs) based on heterogeneous information collected from several measurement devices deployed in the field. This also means that the results of such studies could be significantly affected by the quality of data, particularly concerning the time resolution of the measurements. To better highlight this concern, this paper proposes an analysis of the impact of the time resolution of measurements on the evaluation of the absolute power ramp reduction at the PCC of prosumers in presence of BESS installations. The analysis was performed on real data collected from the eLUX lab of the University of Brescia, Italy, by varying the time resolution from 5 s to 15 min. The results of the analysis demonstrated that the time resolution has a great impact on the evaluation of the considered KPI, by leading to completely different performance assessments.","PeriodicalId":333660,"journal":{"name":"2021 IEEE 11th International Workshop on Applied Measurements for Power Systems (AMPS)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Impact of the Measurement Time Resolution on Energy Key Performance Indicators for Distributed Energy Resources: An Experimental Analysis\",\"authors\":\"M. Pasetti, S. Rinaldi, P. Bellagente, A. Depari, P. Ferrari, A. Flammini, E. Sisinni\",\"doi\":\"10.1109/AMPS50177.2021.9586020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The growing presence of Renewable Energy Sources (RESs) is heavily affecting the control and management of distribution grids. Battery Energy Storage Systems (BESSs) are increasingly adopted to mitigate the adverse impacts caused by the uncertainty of RES generators. Most of the existing works in the literature aims at using BESSs to maximize the self-consumption of energy provided by RES generators or focuses on the mitigation of voltage and/or frequency drift effects. More recently, some research works also studied the effects that BESSs have on the active power flows at the Point of Common Coupling (PCC) of prosumers. All these studies are based on the definition of proper energy Key Performance Indicators (KPIs) based on heterogeneous information collected from several measurement devices deployed in the field. This also means that the results of such studies could be significantly affected by the quality of data, particularly concerning the time resolution of the measurements. To better highlight this concern, this paper proposes an analysis of the impact of the time resolution of measurements on the evaluation of the absolute power ramp reduction at the PCC of prosumers in presence of BESS installations. The analysis was performed on real data collected from the eLUX lab of the University of Brescia, Italy, by varying the time resolution from 5 s to 15 min. The results of the analysis demonstrated that the time resolution has a great impact on the evaluation of the considered KPI, by leading to completely different performance assessments.\",\"PeriodicalId\":333660,\"journal\":{\"name\":\"2021 IEEE 11th International Workshop on Applied Measurements for Power Systems (AMPS)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE 11th International Workshop on Applied Measurements for Power Systems (AMPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AMPS50177.2021.9586020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE 11th International Workshop on Applied Measurements for Power Systems (AMPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AMPS50177.2021.9586020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

可再生能源(RESs)日益增长的存在严重影响着配电网的控制和管理。电池储能系统(bess)被越来越多地采用,以减轻可再生能源发电机不确定性带来的不利影响。现有文献中的大多数工作旨在利用bess最大化RES发电机提供的能量的自我消耗,或者侧重于减轻电压和/或频率漂移效应。最近,一些研究工作也研究了bess对产消费者共耦合点(PCC)有功潮流的影响。所有这些研究都是基于从部署在现场的几个测量设备收集的异构信息来定义适当的能源关键绩效指标(kpi)。这也意味着这类研究的结果可能受到数据质量的显著影响,特别是在测量的时间分辨率方面。为了更好地突出这一问题,本文建议分析测量的时间分辨率对BESS装置存在的产消者PCC绝对功率斜坡减少评估的影响。对从意大利布雷西亚大学eLUX实验室收集的真实数据进行分析,将时间分辨率从5秒更改为15分钟。分析结果表明,时间分辨率对所考虑的KPI的评估有很大影响,导致完全不同的性能评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of the Measurement Time Resolution on Energy Key Performance Indicators for Distributed Energy Resources: An Experimental Analysis
The growing presence of Renewable Energy Sources (RESs) is heavily affecting the control and management of distribution grids. Battery Energy Storage Systems (BESSs) are increasingly adopted to mitigate the adverse impacts caused by the uncertainty of RES generators. Most of the existing works in the literature aims at using BESSs to maximize the self-consumption of energy provided by RES generators or focuses on the mitigation of voltage and/or frequency drift effects. More recently, some research works also studied the effects that BESSs have on the active power flows at the Point of Common Coupling (PCC) of prosumers. All these studies are based on the definition of proper energy Key Performance Indicators (KPIs) based on heterogeneous information collected from several measurement devices deployed in the field. This also means that the results of such studies could be significantly affected by the quality of data, particularly concerning the time resolution of the measurements. To better highlight this concern, this paper proposes an analysis of the impact of the time resolution of measurements on the evaluation of the absolute power ramp reduction at the PCC of prosumers in presence of BESS installations. The analysis was performed on real data collected from the eLUX lab of the University of Brescia, Italy, by varying the time resolution from 5 s to 15 min. The results of the analysis demonstrated that the time resolution has a great impact on the evaluation of the considered KPI, by leading to completely different performance assessments.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信