{"title":"运用事后成本效益分析评估大型基建项目的长远影响","authors":"M. Florio, Silvia Vignetti","doi":"10.2139/ssrn.2723381","DOIUrl":null,"url":null,"abstract":"This paper draws and expands from a recent ex-post evaluation carried out for the European Commission aimed at assessing the long term effects produced by a sample of ten major infrastructures in the Transport and Environment sectors and interpreting the key determinants of the observed performance. This evaluation study offered a unique opportunity to draw conclusions on the value of performing ex-post evaluations and to test an innovative evaluation design combining cost-benefit analysis (CBA) with qualitative assessment and adopting a long-run perspective (30 years), which extends into both the past and the future, and requires a mix of retrospective and prospective analysis. This paper presents the potential of ex-post CBA to assess long term impacts of major infrastructure projects and discusses some methodological and institutional implications related to its use.","PeriodicalId":220068,"journal":{"name":"ERN: Project Evaluation; Social Discount Rate (Topic)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"The Use of Ex Post Cost-Benefit Analysis to Assess the Long-Term Effects of Major Infrastructure Projects\",\"authors\":\"M. Florio, Silvia Vignetti\",\"doi\":\"10.2139/ssrn.2723381\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper draws and expands from a recent ex-post evaluation carried out for the European Commission aimed at assessing the long term effects produced by a sample of ten major infrastructures in the Transport and Environment sectors and interpreting the key determinants of the observed performance. This evaluation study offered a unique opportunity to draw conclusions on the value of performing ex-post evaluations and to test an innovative evaluation design combining cost-benefit analysis (CBA) with qualitative assessment and adopting a long-run perspective (30 years), which extends into both the past and the future, and requires a mix of retrospective and prospective analysis. This paper presents the potential of ex-post CBA to assess long term impacts of major infrastructure projects and discusses some methodological and institutional implications related to its use.\",\"PeriodicalId\":220068,\"journal\":{\"name\":\"ERN: Project Evaluation; Social Discount Rate (Topic)\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Project Evaluation; Social Discount Rate (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2723381\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Project Evaluation; Social Discount Rate (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2723381","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Use of Ex Post Cost-Benefit Analysis to Assess the Long-Term Effects of Major Infrastructure Projects
This paper draws and expands from a recent ex-post evaluation carried out for the European Commission aimed at assessing the long term effects produced by a sample of ten major infrastructures in the Transport and Environment sectors and interpreting the key determinants of the observed performance. This evaluation study offered a unique opportunity to draw conclusions on the value of performing ex-post evaluations and to test an innovative evaluation design combining cost-benefit analysis (CBA) with qualitative assessment and adopting a long-run perspective (30 years), which extends into both the past and the future, and requires a mix of retrospective and prospective analysis. This paper presents the potential of ex-post CBA to assess long term impacts of major infrastructure projects and discusses some methodological and institutional implications related to its use.