具有时变产品组合的作业车间在截止日期约束下的作业释放

Zhang Tao, O. Rose
{"title":"具有时变产品组合的作业车间在截止日期约束下的作业释放","authors":"Zhang Tao, O. Rose","doi":"10.1109/WSC.2014.7020065","DOIUrl":null,"url":null,"abstract":"Job shops produce products on the basis of manufacturing orders which specify the due date and the volume. The orders accepted by the shop floor are put into a job pool. The job release decides when to start each job in the pool. It attempts not only to balance this time-varying demand against available capacity, but also manages to meet the due date constraints. The general job release policies, such as output-based or workload-based policies, have poor due date performance. A multi-time-periods release policy is proposed to match the time-varying demand. The due date pressure is distributed to every period. In each time period a near optimal short-term throughput of each product is obtained by an optimization model. The optimization problem is solved by an improved ant colony algorithm. In iteration processes of the algorithm ants are evaluated by the simulation which involves the setup and breakdown of machines.","PeriodicalId":446873,"journal":{"name":"Proceedings of the Winter Simulation Conference 2014","volume":"166 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Job release under due date constraints in job shops with time-varying product mix\",\"authors\":\"Zhang Tao, O. Rose\",\"doi\":\"10.1109/WSC.2014.7020065\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Job shops produce products on the basis of manufacturing orders which specify the due date and the volume. The orders accepted by the shop floor are put into a job pool. The job release decides when to start each job in the pool. It attempts not only to balance this time-varying demand against available capacity, but also manages to meet the due date constraints. The general job release policies, such as output-based or workload-based policies, have poor due date performance. A multi-time-periods release policy is proposed to match the time-varying demand. The due date pressure is distributed to every period. In each time period a near optimal short-term throughput of each product is obtained by an optimization model. The optimization problem is solved by an improved ant colony algorithm. In iteration processes of the algorithm ants are evaluated by the simulation which involves the setup and breakdown of machines.\",\"PeriodicalId\":446873,\"journal\":{\"name\":\"Proceedings of the Winter Simulation Conference 2014\",\"volume\":\"166 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Winter Simulation Conference 2014\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC.2014.7020065\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Winter Simulation Conference 2014","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2014.7020065","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作业车间根据指定交货日期和数量的制造订单生产产品。车间接受的订单被放入作业池中。作业释放决定何时启动池中的每个作业。它不仅试图平衡这种随时间变化的需求和可用容量,而且还设法满足到期日期的限制。一般的作业释放策略(如基于输出或基于工作负载的策略)的到期日期性能较差。针对时变需求,提出了一种多时间段的放行策略。到期日期压力分布到每个周期。在每个时间段内,通过优化模型获得每个产品的近最优短期吞吐量。采用改进的蚁群算法求解优化问题。在算法的迭代过程中,通过模拟对蚁群进行评估,其中包括机器的建立和故障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Job release under due date constraints in job shops with time-varying product mix
Job shops produce products on the basis of manufacturing orders which specify the due date and the volume. The orders accepted by the shop floor are put into a job pool. The job release decides when to start each job in the pool. It attempts not only to balance this time-varying demand against available capacity, but also manages to meet the due date constraints. The general job release policies, such as output-based or workload-based policies, have poor due date performance. A multi-time-periods release policy is proposed to match the time-varying demand. The due date pressure is distributed to every period. In each time period a near optimal short-term throughput of each product is obtained by an optimization model. The optimization problem is solved by an improved ant colony algorithm. In iteration processes of the algorithm ants are evaluated by the simulation which involves the setup and breakdown of machines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信