{"title":"MPD规划:多少才够?","authors":"P. Spriggs, P. J. Frink","doi":"10.2118/113682-MS","DOIUrl":null,"url":null,"abstract":"THIS ARTICLE ADDRESSES the key drivers and risks associated with the use of applied backpressure managed pressure drilling. One of the two key issues that must be understood early on is whether the well can be drilled statically overbalanced or if it needs to be drilled with a statically underbalanced fluid. The second issue to comprehend is the level of service needed to avoid compromising safety and well objectives. Answering these two questions defines the path to be followed for adequate planning.","PeriodicalId":352079,"journal":{"name":"Drilling contractor","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"MPD Planning: How Much Is Enough?\",\"authors\":\"P. Spriggs, P. J. Frink\",\"doi\":\"10.2118/113682-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"THIS ARTICLE ADDRESSES the key drivers and risks associated with the use of applied backpressure managed pressure drilling. One of the two key issues that must be understood early on is whether the well can be drilled statically overbalanced or if it needs to be drilled with a statically underbalanced fluid. The second issue to comprehend is the level of service needed to avoid compromising safety and well objectives. Answering these two questions defines the path to be followed for adequate planning.\",\"PeriodicalId\":352079,\"journal\":{\"name\":\"Drilling contractor\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Drilling contractor\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/113682-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Drilling contractor","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/113682-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
THIS ARTICLE ADDRESSES the key drivers and risks associated with the use of applied backpressure managed pressure drilling. One of the two key issues that must be understood early on is whether the well can be drilled statically overbalanced or if it needs to be drilled with a statically underbalanced fluid. The second issue to comprehend is the level of service needed to avoid compromising safety and well objectives. Answering these two questions defines the path to be followed for adequate planning.