人力资源信息系统实施过程:以XYZ银行为例

Anggoro Gagah Nugroho, Haryani Diah Sitawati, Hidayat Akbar, Retiana Fadma Pertiwi Sinaga, P. Putra
{"title":"人力资源信息系统实施过程:以XYZ银行为例","authors":"Anggoro Gagah Nugroho, Haryani Diah Sitawati, Hidayat Akbar, Retiana Fadma Pertiwi Sinaga, P. Putra","doi":"10.1109/ISITDI55734.2022.9944519","DOIUrl":null,"url":null,"abstract":"Basically this research is to discuss how successfully select and implement HRIS at organization that have large-scale and complex condition. Also understand the process implementation included sticking to a timeline. Bank XYZ is a case study in this research, the reason to implement HRIS is because in human resource management division was previously carried out in seven systems that were not integrated (Time Management, Performance Management, Travel Management, Learning Management System, Personnel Administration, Organization Management and Payroll/Tax), so interface and scheduler were needed to stream data. As a result, data could not be accessed in real time in other applications that needed it. The large-scale organization has an issue in sticking to a timeline, because Bank XYZ has a large scale and complex organizational conditions, we can learn from Bank XYZ how the process implementation HRIS in large-scale company to that issue. From the results of document analysis and interviews, HRIS implementation process in Bank XYZ have been done in several phases based on application software package model methodology including the definition, selection, development and implementation and operation phases. In addition to the planned implementation phase change management was needed in this HRIS implementation process, so that implementation can be carried out in accordance with the specified time. Then for large-scale and complex organization can learn how to implement HRIS right into the timeline based on this research.","PeriodicalId":312644,"journal":{"name":"2022 International Symposium on Information Technology and Digital Innovation (ISITDI)","volume":"118 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"HRIS Implementation Process: Case Study on Bank XYZ\",\"authors\":\"Anggoro Gagah Nugroho, Haryani Diah Sitawati, Hidayat Akbar, Retiana Fadma Pertiwi Sinaga, P. Putra\",\"doi\":\"10.1109/ISITDI55734.2022.9944519\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Basically this research is to discuss how successfully select and implement HRIS at organization that have large-scale and complex condition. Also understand the process implementation included sticking to a timeline. Bank XYZ is a case study in this research, the reason to implement HRIS is because in human resource management division was previously carried out in seven systems that were not integrated (Time Management, Performance Management, Travel Management, Learning Management System, Personnel Administration, Organization Management and Payroll/Tax), so interface and scheduler were needed to stream data. As a result, data could not be accessed in real time in other applications that needed it. The large-scale organization has an issue in sticking to a timeline, because Bank XYZ has a large scale and complex organizational conditions, we can learn from Bank XYZ how the process implementation HRIS in large-scale company to that issue. From the results of document analysis and interviews, HRIS implementation process in Bank XYZ have been done in several phases based on application software package model methodology including the definition, selection, development and implementation and operation phases. In addition to the planned implementation phase change management was needed in this HRIS implementation process, so that implementation can be carried out in accordance with the specified time. Then for large-scale and complex organization can learn how to implement HRIS right into the timeline based on this research.\",\"PeriodicalId\":312644,\"journal\":{\"name\":\"2022 International Symposium on Information Technology and Digital Innovation (ISITDI)\",\"volume\":\"118 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 International Symposium on Information Technology and Digital Innovation (ISITDI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISITDI55734.2022.9944519\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Symposium on Information Technology and Digital Innovation (ISITDI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISITDI55734.2022.9944519","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究主要是探讨如何在具有大规模和复杂条件的组织中成功地选择和实施人力资源信息系统。还要了解流程实现,包括遵守时间表。XYZ银行是本研究中的一个案例研究,实施HRIS的原因是因为人力资源管理部门以前在七个未集成的系统中进行(时间管理,绩效管理,差旅管理,学习管理系统,人事管理,组织管理和工资/税务),因此需要接口和调度程序来传输数据。因此,在其他需要数据的应用程序中无法实时访问数据。大型组织在坚持时间表方面存在问题,因为XYZ银行规模大,组织条件复杂,我们可以从XYZ银行学习如何在大型公司实施HRIS的过程来解决这个问题。从文献分析和访谈的结果来看,基于应用软件包模型方法论,XYZ银行的HRIS实施过程分为几个阶段,包括定义、选择、开发和实施以及运营阶段。在此HRIS实施过程中,除了有计划的实施外,还需要进行阶段变更管理,使实施能够按照规定的时间进行。在此基础上,对于大型、复杂的组织,可以学习到如何将人力资源信息系统正确地实施到时间轴中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
HRIS Implementation Process: Case Study on Bank XYZ
Basically this research is to discuss how successfully select and implement HRIS at organization that have large-scale and complex condition. Also understand the process implementation included sticking to a timeline. Bank XYZ is a case study in this research, the reason to implement HRIS is because in human resource management division was previously carried out in seven systems that were not integrated (Time Management, Performance Management, Travel Management, Learning Management System, Personnel Administration, Organization Management and Payroll/Tax), so interface and scheduler were needed to stream data. As a result, data could not be accessed in real time in other applications that needed it. The large-scale organization has an issue in sticking to a timeline, because Bank XYZ has a large scale and complex organizational conditions, we can learn from Bank XYZ how the process implementation HRIS in large-scale company to that issue. From the results of document analysis and interviews, HRIS implementation process in Bank XYZ have been done in several phases based on application software package model methodology including the definition, selection, development and implementation and operation phases. In addition to the planned implementation phase change management was needed in this HRIS implementation process, so that implementation can be carried out in accordance with the specified time. Then for large-scale and complex organization can learn how to implement HRIS right into the timeline based on this research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信