{"title":"基于跨职能关系的项目交付系统选择工具框架","authors":"Wonkee Cho, M. Hajdu","doi":"10.3311/ccc2019-017","DOIUrl":null,"url":null,"abstract":"Construction project implements a typical project delivery method, procurement method, and contract types that have distinguished characteristics. Selecting the most sufficient method that has the benefits to success and reduces the risk of failure of the project has been a concerning point for project owners. This report is intended to suggest a framework of a project delivery system selection that considers the correlation between the project delivery method, procurement method, and contract types. The application of the tool for the owner will be in two steps. The first step to set up the initial goals and risks of the project to properly evaluate the tools and second step for answering the checklist questions based on the goals and risks that were set by themselves. As the characteristics of each type of delivery, procurement, or contract are defined from previous experience, our tool suggests the prior option of selection combination that can aid the owner's decision.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"473 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Framework of Project Delivery System Selection Tool Based on Cross Functional Relationship\",\"authors\":\"Wonkee Cho, M. Hajdu\",\"doi\":\"10.3311/ccc2019-017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction project implements a typical project delivery method, procurement method, and contract types that have distinguished characteristics. Selecting the most sufficient method that has the benefits to success and reduces the risk of failure of the project has been a concerning point for project owners. This report is intended to suggest a framework of a project delivery system selection that considers the correlation between the project delivery method, procurement method, and contract types. The application of the tool for the owner will be in two steps. The first step to set up the initial goals and risks of the project to properly evaluate the tools and second step for answering the checklist questions based on the goals and risks that were set by themselves. As the characteristics of each type of delivery, procurement, or contract are defined from previous experience, our tool suggests the prior option of selection combination that can aid the owner's decision.\",\"PeriodicalId\":231420,\"journal\":{\"name\":\"Proceedings of the Creative Construction Conference 2019\",\"volume\":\"473 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Creative Construction Conference 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ccc2019-017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Framework of Project Delivery System Selection Tool Based on Cross Functional Relationship
Construction project implements a typical project delivery method, procurement method, and contract types that have distinguished characteristics. Selecting the most sufficient method that has the benefits to success and reduces the risk of failure of the project has been a concerning point for project owners. This report is intended to suggest a framework of a project delivery system selection that considers the correlation between the project delivery method, procurement method, and contract types. The application of the tool for the owner will be in two steps. The first step to set up the initial goals and risks of the project to properly evaluate the tools and second step for answering the checklist questions based on the goals and risks that were set by themselves. As the characteristics of each type of delivery, procurement, or contract are defined from previous experience, our tool suggests the prior option of selection combination that can aid the owner's decision.