{"title":"开发的定义1:业务开发","authors":"A. Bowes","doi":"10.1093/9780198833253.003.0005","DOIUrl":null,"url":null,"abstract":"Section 57(1) of the 1990 Act provides that, subject to the following provisions of that section, ‘planning permission is required for the carrying out of any development of land’. This planning permission may be granted following the determination of an express application for permission made to the local planning authority for the area in which the land is situated. In other cases, however, it is not necessary for an express application to be made. This is because planning permission for the development in question may have been granted by a development order, which may be a special, local, neighbourhood, or general order (such development is generally known as ‘permitted’ development), or by some other specific statutory provision (as in the case of enterprise zones or simplified planning zones), or be deemed to have been granted under other provisions of the Act (as in the case of the display of certain advertisements), or authorized by some private Act of Parliament.","PeriodicalId":168691,"journal":{"name":"A Practical Approach to Planning Law","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Definition of Development 1: Operational Development\",\"authors\":\"A. Bowes\",\"doi\":\"10.1093/9780198833253.003.0005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Section 57(1) of the 1990 Act provides that, subject to the following provisions of that section, ‘planning permission is required for the carrying out of any development of land’. This planning permission may be granted following the determination of an express application for permission made to the local planning authority for the area in which the land is situated. In other cases, however, it is not necessary for an express application to be made. This is because planning permission for the development in question may have been granted by a development order, which may be a special, local, neighbourhood, or general order (such development is generally known as ‘permitted’ development), or by some other specific statutory provision (as in the case of enterprise zones or simplified planning zones), or be deemed to have been granted under other provisions of the Act (as in the case of the display of certain advertisements), or authorized by some private Act of Parliament.\",\"PeriodicalId\":168691,\"journal\":{\"name\":\"A Practical Approach to Planning Law\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"A Practical Approach to Planning Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/9780198833253.003.0005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"A Practical Approach to Planning Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/9780198833253.003.0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1990年法案第57(1)条规定,根据该条的以下规定,“进行任何土地开发都需要规划许可”。在向土地所在地区的地方规划主管部门提出明确的许可申请后,可授予该规划许可。但在其他情况下,则无须作出明示申请。这是因为所讨论的开发的规划许可可能是由开发命令授予的,这可能是一个特殊的、地方的、社区的或一般的命令(这种开发通常被称为“许可的”开发),或者是由一些其他特定的法定条款(如企业区或简化规划区的情况),或者被认为是根据该法案的其他条款授予的(如展示某些广告的情况)。或者由议会的一些私人法案授权。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Definition of Development 1: Operational Development
Section 57(1) of the 1990 Act provides that, subject to the following provisions of that section, ‘planning permission is required for the carrying out of any development of land’. This planning permission may be granted following the determination of an express application for permission made to the local planning authority for the area in which the land is situated. In other cases, however, it is not necessary for an express application to be made. This is because planning permission for the development in question may have been granted by a development order, which may be a special, local, neighbourhood, or general order (such development is generally known as ‘permitted’ development), or by some other specific statutory provision (as in the case of enterprise zones or simplified planning zones), or be deemed to have been granted under other provisions of the Act (as in the case of the display of certain advertisements), or authorized by some private Act of Parliament.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信