摩根敦系统概述

D. G. Shellhorn
{"title":"摩根敦系统概述","authors":"D. G. Shellhorn","doi":"10.1109/VTC.1978.1622578","DOIUrl":null,"url":null,"abstract":"The initial portion of the Morgantown system has been operating in passenger service since September 1975. This paper defines the extensions necessary to complete the Phase II system, and relates the problems observed in operations to design changes that will be incorporated in Phase II. A brief program history, system element description, and operational scenario is included for continuity.","PeriodicalId":264799,"journal":{"name":"28th IEEE Vehicular Technology Conference","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1978-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Morgantown system overview\",\"authors\":\"D. G. Shellhorn\",\"doi\":\"10.1109/VTC.1978.1622578\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The initial portion of the Morgantown system has been operating in passenger service since September 1975. This paper defines the extensions necessary to complete the Phase II system, and relates the problems observed in operations to design changes that will be incorporated in Phase II. A brief program history, system element description, and operational scenario is included for continuity.\",\"PeriodicalId\":264799,\"journal\":{\"name\":\"28th IEEE Vehicular Technology Conference\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1978-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"28th IEEE Vehicular Technology Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VTC.1978.1622578\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"28th IEEE Vehicular Technology Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VTC.1978.1622578","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

摩根敦地铁系统的初始部分自1975年9月开始运营客运服务。本文定义了完成第二期系统所需的扩展,并将操作中观察到的问题与将纳入第二期的设计变更联系起来。一个简短的程序历史,系统元素描述,和操作场景包括连续性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Morgantown system overview
The initial portion of the Morgantown system has been operating in passenger service since September 1975. This paper defines the extensions necessary to complete the Phase II system, and relates the problems observed in operations to design changes that will be incorporated in Phase II. A brief program history, system element description, and operational scenario is included for continuity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信