{"title":"为伊朗公立医院设计公私合作模式","authors":"M. Barzegar, S. Tabibi, M. Maleki, A. Nasiripour","doi":"10.15171/IJHR.2016.08","DOIUrl":null,"url":null,"abstract":"Background and Objectives: Public-Private Partnership (PPP) is a well-established model to alleviate the risk of investment in health domain. While the model is widely applied in the developed countries, the adoption of the model in many developing countries is hampered partly by the lack of knowledge on dimensions and requirements of its local implementation. The present study, thus, aimed to identify the key aspects of PPP for hospital building in an Iranian context. Methods: A comparative study of PPP implementation in seven pioneer countries revealed 53 elements potentially influencing development of PPP. Using rigorous expert opinion seeking, these elements were refined and adapted with respect to the Iranian context. Based on this information a 38-item questionnaire was designed. The questionnaire was distributed among 220 experts from different health domains, including clinicians of public and private hospitals and policy makers, executives, and authorized advisors from MOHME and various medical universities. The collected data were analyzed using exploratory factors analysis in order to identify factors influencing PPP development. The robustness of the identified factors was further explored by confirmatory factor analysis. Findings: Legislation, policy making, finance, capacity building, and social orientation were identified as the five key dimensions of hospital-building PPP implementation in the Iranian context. Conclusions: Identification of the major dimensions of hospital PPP implementation may help policy-makers to develop effective strategies for promotion of PPP in the Iranian health system.","PeriodicalId":178002,"journal":{"name":"international journal of hospital research","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Designing a Public-Private Partnership Model for Public Hospitals in Iran\",\"authors\":\"M. Barzegar, S. Tabibi, M. Maleki, A. Nasiripour\",\"doi\":\"10.15171/IJHR.2016.08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background and Objectives: Public-Private Partnership (PPP) is a well-established model to alleviate the risk of investment in health domain. While the model is widely applied in the developed countries, the adoption of the model in many developing countries is hampered partly by the lack of knowledge on dimensions and requirements of its local implementation. The present study, thus, aimed to identify the key aspects of PPP for hospital building in an Iranian context. Methods: A comparative study of PPP implementation in seven pioneer countries revealed 53 elements potentially influencing development of PPP. Using rigorous expert opinion seeking, these elements were refined and adapted with respect to the Iranian context. Based on this information a 38-item questionnaire was designed. The questionnaire was distributed among 220 experts from different health domains, including clinicians of public and private hospitals and policy makers, executives, and authorized advisors from MOHME and various medical universities. The collected data were analyzed using exploratory factors analysis in order to identify factors influencing PPP development. The robustness of the identified factors was further explored by confirmatory factor analysis. Findings: Legislation, policy making, finance, capacity building, and social orientation were identified as the five key dimensions of hospital-building PPP implementation in the Iranian context. Conclusions: Identification of the major dimensions of hospital PPP implementation may help policy-makers to develop effective strategies for promotion of PPP in the Iranian health system.\",\"PeriodicalId\":178002,\"journal\":{\"name\":\"international journal of hospital research\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"international journal of hospital research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15171/IJHR.2016.08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"international journal of hospital research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15171/IJHR.2016.08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

背景和目标:公私伙伴关系(PPP)是缓解卫生领域投资风险的成熟模式。虽然这一模式在发达国家得到广泛应用,但在许多发展中国家采用这一模式却受到阻碍,部分原因是缺乏对其在当地执行的层面和要求的了解。因此,本研究旨在确定PPP在伊朗医院建设中的关键方面。方法:通过对7个PPP先行国家PPP实施情况的比较研究,揭示了影响PPP发展的53个潜在因素。在严格征求专家意见的情况下,这些元素根据伊朗的情况进行了提炼和调整。在此基础上设计了一份包含38个项目的问卷。该问卷在220名来自不同卫生领域的专家中分发,包括公立和私立医院的临床医生以及卫生部和各医科大学的决策者、行政人员和授权顾问。采用探索性因素分析对收集到的数据进行分析,以确定影响PPP发展的因素。通过验证性因子分析进一步探讨了识别因素的稳健性。研究结果:立法、政策制定、财政、能力建设和社会取向被确定为伊朗医院建设PPP实施的五个关键方面。结论:确定医院PPP实施的主要维度可能有助于决策者制定有效的战略,以促进伊朗卫生系统的PPP。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Designing a Public-Private Partnership Model for Public Hospitals in Iran
Background and Objectives: Public-Private Partnership (PPP) is a well-established model to alleviate the risk of investment in health domain. While the model is widely applied in the developed countries, the adoption of the model in many developing countries is hampered partly by the lack of knowledge on dimensions and requirements of its local implementation. The present study, thus, aimed to identify the key aspects of PPP for hospital building in an Iranian context. Methods: A comparative study of PPP implementation in seven pioneer countries revealed 53 elements potentially influencing development of PPP. Using rigorous expert opinion seeking, these elements were refined and adapted with respect to the Iranian context. Based on this information a 38-item questionnaire was designed. The questionnaire was distributed among 220 experts from different health domains, including clinicians of public and private hospitals and policy makers, executives, and authorized advisors from MOHME and various medical universities. The collected data were analyzed using exploratory factors analysis in order to identify factors influencing PPP development. The robustness of the identified factors was further explored by confirmatory factor analysis. Findings: Legislation, policy making, finance, capacity building, and social orientation were identified as the five key dimensions of hospital-building PPP implementation in the Iranian context. Conclusions: Identification of the major dimensions of hospital PPP implementation may help policy-makers to develop effective strategies for promotion of PPP in the Iranian health system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信