Yinguo Yang, Q. Duan, Guobing Wu, Rui Chen, Li Li, Z. An, Jingmin Ni, Chen Shen
{"title":"基于慢相干的南方电网自适应控制孤岛方案","authors":"Yinguo Yang, Q. Duan, Guobing Wu, Rui Chen, Li Li, Z. An, Jingmin Ni, Chen Shen","doi":"10.1109/APPEEC.2015.7381048","DOIUrl":null,"url":null,"abstract":"Emergency islanding control is the last line of defense to avoid power system collapse, and it plays an important role in the prevention of large scale blackout. This paper carries out the study of slow coherency based adaptive controlled islanding aiming to design an islanding control scheme applicable to AC/DC interconnected power systems. Firstly, a slow coherency based islanding method is proposed based on the mode information in form of complex number, which can deal with the load buses. Then, several criteria are introduced to determine whether an AC/DC hybrid grid is suitable to be split. Finally, the scheme and the criteria are used to design an appropriate islanding scheme for the China Southern Power Grid.","PeriodicalId":439089,"journal":{"name":"2015 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Slow coherency based adaptive controlled islanding scheme of the China Southern Power Grid\",\"authors\":\"Yinguo Yang, Q. Duan, Guobing Wu, Rui Chen, Li Li, Z. An, Jingmin Ni, Chen Shen\",\"doi\":\"10.1109/APPEEC.2015.7381048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Emergency islanding control is the last line of defense to avoid power system collapse, and it plays an important role in the prevention of large scale blackout. This paper carries out the study of slow coherency based adaptive controlled islanding aiming to design an islanding control scheme applicable to AC/DC interconnected power systems. Firstly, a slow coherency based islanding method is proposed based on the mode information in form of complex number, which can deal with the load buses. Then, several criteria are introduced to determine whether an AC/DC hybrid grid is suitable to be split. Finally, the scheme and the criteria are used to design an appropriate islanding scheme for the China Southern Power Grid.\",\"PeriodicalId\":439089,\"journal\":{\"name\":\"2015 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APPEEC.2015.7381048\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APPEEC.2015.7381048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Slow coherency based adaptive controlled islanding scheme of the China Southern Power Grid
Emergency islanding control is the last line of defense to avoid power system collapse, and it plays an important role in the prevention of large scale blackout. This paper carries out the study of slow coherency based adaptive controlled islanding aiming to design an islanding control scheme applicable to AC/DC interconnected power systems. Firstly, a slow coherency based islanding method is proposed based on the mode information in form of complex number, which can deal with the load buses. Then, several criteria are introduced to determine whether an AC/DC hybrid grid is suitable to be split. Finally, the scheme and the criteria are used to design an appropriate islanding scheme for the China Southern Power Grid.