{"title":"实时系统设计环境中的时序分析和条件调度","authors":"Zebo Peng, Anders Törne","doi":"10.1109/EMWRTS.1994.336840","DOIUrl":null,"url":null,"abstract":"This paper presents an approach to carry out timing analysis and scheduling in a real-time system design environment for flexible manufacturing systems. It is built based on a formal model for specifying real-time systems using extended timed Petri nets. The designer uses the model to specify a design at a given level. The functional characteristics as well as timing properties of the design can then be analyzed with design evaluation procedures. To facilitate timing analysis, a conditional scheduling strategy has been developed to provide a pre-run-time schedule. The strategy is based on a list scheduling method with several priority schemes. This paper describes the design environment, the timing analysis procedure, and the basic strategy for scheduling.<<ETX>>","PeriodicalId":322579,"journal":{"name":"Proceedings Sixth Euromicro Workshop on Real-Time Systems","volume":"167 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Timing analysis and conditional scheduling in a real-time system design environment\",\"authors\":\"Zebo Peng, Anders Törne\",\"doi\":\"10.1109/EMWRTS.1994.336840\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an approach to carry out timing analysis and scheduling in a real-time system design environment for flexible manufacturing systems. It is built based on a formal model for specifying real-time systems using extended timed Petri nets. The designer uses the model to specify a design at a given level. The functional characteristics as well as timing properties of the design can then be analyzed with design evaluation procedures. To facilitate timing analysis, a conditional scheduling strategy has been developed to provide a pre-run-time schedule. The strategy is based on a list scheduling method with several priority schemes. This paper describes the design environment, the timing analysis procedure, and the basic strategy for scheduling.<<ETX>>\",\"PeriodicalId\":322579,\"journal\":{\"name\":\"Proceedings Sixth Euromicro Workshop on Real-Time Systems\",\"volume\":\"167 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Sixth Euromicro Workshop on Real-Time Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMWRTS.1994.336840\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Sixth Euromicro Workshop on Real-Time Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMWRTS.1994.336840","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Timing analysis and conditional scheduling in a real-time system design environment
This paper presents an approach to carry out timing analysis and scheduling in a real-time system design environment for flexible manufacturing systems. It is built based on a formal model for specifying real-time systems using extended timed Petri nets. The designer uses the model to specify a design at a given level. The functional characteristics as well as timing properties of the design can then be analyzed with design evaluation procedures. To facilitate timing analysis, a conditional scheduling strategy has been developed to provide a pre-run-time schedule. The strategy is based on a list scheduling method with several priority schemes. This paper describes the design environment, the timing analysis procedure, and the basic strategy for scheduling.<>