利用流体动力学建模的特殊选项自适应试验井以及COI上PLT期间井内气液流动的平稳和非平稳建模结果

A. Varavva, A. Yamaletdinov, R. Apasov, R. Badgutdinov, D. Samolovov
{"title":"利用流体动力学建模的特殊选项自适应试验井以及COI上PLT期间井内气液流动的平稳和非平稳建模结果","authors":"A. Varavva, A. Yamaletdinov, R. Apasov, R. Badgutdinov, D. Samolovov","doi":"10.2118/212104-ms","DOIUrl":null,"url":null,"abstract":"\n Fields X and Y are large gas condensate fields located on the Yamal Peninsula. The fields have a multi-layer structure, at field X, it is planned to bring into development 15 formations combined into 5 development targets, at field B – 18 formations combined into 10 development targets. Separate development targets include up to 6 formations penetrated with horizontal wells. In 2021, 4 horizontal and multilateral pilot commercial development wells were drilled at the fields previously studied only with exploratory wells in 1970-1990, which helped specify the petrophysical, conceptual, geological, fluid, and reservoir simulation model of the field. The new data helped make important investment decisions and switch the project to the Implement stage. During the creation and history matching of the reservoir simulation models of these fields, the small amount of actual data and the existing significant uncertainties in the initial data required to perform multivariant calculations and integrate all field studies (results of flow testing, gas condensate studies, downhole pressure and temperature readings, as well as sludge-and-water monitor readings obtained during downhole logging with coiled tubing) to determine the unknown parameters of the penetrated formations, the share of inflow from them and to narrow down the existing ranges of uncertainties. This work helped specify the RSM – the core of forecast production profiles that formed the basis of decisions on the construction of infrastructure facilities and drilling of additional wells to meet gas production obligations in 2025-2028.","PeriodicalId":131012,"journal":{"name":"Day 2 Wed, November 16, 2022","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Auto-Adaptation of a Pilot Well with the Use of Special Options for Hydrodynamic Modeling and the Results of Stationary and Non-Stationary Modeling of Gas-Liquid Flow inside the Well During PLT on COI\",\"authors\":\"A. Varavva, A. Yamaletdinov, R. Apasov, R. Badgutdinov, D. Samolovov\",\"doi\":\"10.2118/212104-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Fields X and Y are large gas condensate fields located on the Yamal Peninsula. The fields have a multi-layer structure, at field X, it is planned to bring into development 15 formations combined into 5 development targets, at field B – 18 formations combined into 10 development targets. Separate development targets include up to 6 formations penetrated with horizontal wells. In 2021, 4 horizontal and multilateral pilot commercial development wells were drilled at the fields previously studied only with exploratory wells in 1970-1990, which helped specify the petrophysical, conceptual, geological, fluid, and reservoir simulation model of the field. The new data helped make important investment decisions and switch the project to the Implement stage. During the creation and history matching of the reservoir simulation models of these fields, the small amount of actual data and the existing significant uncertainties in the initial data required to perform multivariant calculations and integrate all field studies (results of flow testing, gas condensate studies, downhole pressure and temperature readings, as well as sludge-and-water monitor readings obtained during downhole logging with coiled tubing) to determine the unknown parameters of the penetrated formations, the share of inflow from them and to narrow down the existing ranges of uncertainties. This work helped specify the RSM – the core of forecast production profiles that formed the basis of decisions on the construction of infrastructure facilities and drilling of additional wells to meet gas production obligations in 2025-2028.\",\"PeriodicalId\":131012,\"journal\":{\"name\":\"Day 2 Wed, November 16, 2022\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, November 16, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/212104-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, November 16, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212104-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

X和Y油田是位于亚马尔半岛的大型凝析气田。该油田具有多层结构,在X油田,计划开发15个地层,共5个开发目标,在B油田,计划开发18个地层,共10个开发目标。单独的开发目标包括多达6个水平井穿透地层。2021年,在1970-1990年仅用探井进行研究的油田,钻了4口水平井和多边商业开发试验井,这有助于明确该油田的岩石物理、概念、地质、流体和油藏模拟模型。新的数据有助于做出重要的投资决策,并将项目转入实施阶段。在这些油田油藏模拟模型的创建和历史匹配过程中,由于实际数据少,初始数据存在很大的不确定性,需要进行多变量计算,并整合所有现场研究(流量测试结果、凝析气研究、井下压力和温度读数)。以及在使用连续油管进行井下测井时获得的污泥和水监测读数,以确定已穿透地层的未知参数,以及这些地层的流入份额,并缩小现有的不确定性范围。这项工作有助于确定RSM——预测产量曲线的核心,它构成了基础设施建设和钻更多井以满足2025-2028年天然气生产义务的决策基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Auto-Adaptation of a Pilot Well with the Use of Special Options for Hydrodynamic Modeling and the Results of Stationary and Non-Stationary Modeling of Gas-Liquid Flow inside the Well During PLT on COI
Fields X and Y are large gas condensate fields located on the Yamal Peninsula. The fields have a multi-layer structure, at field X, it is planned to bring into development 15 formations combined into 5 development targets, at field B – 18 formations combined into 10 development targets. Separate development targets include up to 6 formations penetrated with horizontal wells. In 2021, 4 horizontal and multilateral pilot commercial development wells were drilled at the fields previously studied only with exploratory wells in 1970-1990, which helped specify the petrophysical, conceptual, geological, fluid, and reservoir simulation model of the field. The new data helped make important investment decisions and switch the project to the Implement stage. During the creation and history matching of the reservoir simulation models of these fields, the small amount of actual data and the existing significant uncertainties in the initial data required to perform multivariant calculations and integrate all field studies (results of flow testing, gas condensate studies, downhole pressure and temperature readings, as well as sludge-and-water monitor readings obtained during downhole logging with coiled tubing) to determine the unknown parameters of the penetrated formations, the share of inflow from them and to narrow down the existing ranges of uncertainties. This work helped specify the RSM – the core of forecast production profiles that formed the basis of decisions on the construction of infrastructure facilities and drilling of additional wells to meet gas production obligations in 2025-2028.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信