WAPP国家电网互联稳定性研究——以控制区II(加纳、多哥和贝宁)为例

M. Medewou, P. Chetangny, S. Houndedako, A. Vianou, D. Chamagne, G. Barbier
{"title":"WAPP国家电网互联稳定性研究——以控制区II(加纳、多哥和贝宁)为例","authors":"M. Medewou, P. Chetangny, S. Houndedako, A. Vianou, D. Chamagne, G. Barbier","doi":"10.1109/PowerAfrica.2019.8928660","DOIUrl":null,"url":null,"abstract":"In the context of the ECOWAS power transmission networks interconnection project led by WEST-AFRICAN POWER POOL (WAPP), a master plan was drawn up in 2004 and updated in 2011. This plan recommended the partitioning of the ECOWAS area into five (05) control zones to ensure effective control of the stability parameters of the interconnected network. This paper is a study of the functioning and stability of the power network of control Zone 2 composed of Benin, Togo and Ghana. After an inventory of the production and transmission infrastructures and the survey of the load curves of each country, the network of the control zone 2 is modeled with the CYME software version 8.1.6 and analyzed with the Newton-Raphson algorithm. With the voltage plans taken from steady state simulation and transient stability tests, technical solutions have been proposed and implemented to improve the zone 2 power network stability.","PeriodicalId":308661,"journal":{"name":"2019 IEEE PES/IAS PowerAfrica","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stability study of the interconnection of electricity networks of WAPP countries - case of control zone II (Ghana, Togo & Benin)\",\"authors\":\"M. Medewou, P. Chetangny, S. Houndedako, A. Vianou, D. Chamagne, G. Barbier\",\"doi\":\"10.1109/PowerAfrica.2019.8928660\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the context of the ECOWAS power transmission networks interconnection project led by WEST-AFRICAN POWER POOL (WAPP), a master plan was drawn up in 2004 and updated in 2011. This plan recommended the partitioning of the ECOWAS area into five (05) control zones to ensure effective control of the stability parameters of the interconnected network. This paper is a study of the functioning and stability of the power network of control Zone 2 composed of Benin, Togo and Ghana. After an inventory of the production and transmission infrastructures and the survey of the load curves of each country, the network of the control zone 2 is modeled with the CYME software version 8.1.6 and analyzed with the Newton-Raphson algorithm. With the voltage plans taken from steady state simulation and transient stability tests, technical solutions have been proposed and implemented to improve the zone 2 power network stability.\",\"PeriodicalId\":308661,\"journal\":{\"name\":\"2019 IEEE PES/IAS PowerAfrica\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE PES/IAS PowerAfrica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PowerAfrica.2019.8928660\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE PES/IAS PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PowerAfrica.2019.8928660","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在西非国家经济共同体输电网络互联项目的背景下,西非电力联运(WAPP)于2004年制定了总体规划,并于2011年进行了更新。该计划建议将西非经共体地区划分为5个控制区,以确保有效控制互联网络的稳定性参数。本文研究了由贝宁、多哥和加纳组成的控制区2电网的运行和稳定性问题。在对生产和输电基础设施进行清查,对各国负荷曲线进行调查后,利用CYME 8.1.6版软件对控制区2的电网进行建模,并采用Newton-Raphson算法进行分析。根据稳态仿真和暂态稳定试验得出的电压方案,提出并实施了提高2区电网稳定性的技术解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stability study of the interconnection of electricity networks of WAPP countries - case of control zone II (Ghana, Togo & Benin)
In the context of the ECOWAS power transmission networks interconnection project led by WEST-AFRICAN POWER POOL (WAPP), a master plan was drawn up in 2004 and updated in 2011. This plan recommended the partitioning of the ECOWAS area into five (05) control zones to ensure effective control of the stability parameters of the interconnected network. This paper is a study of the functioning and stability of the power network of control Zone 2 composed of Benin, Togo and Ghana. After an inventory of the production and transmission infrastructures and the survey of the load curves of each country, the network of the control zone 2 is modeled with the CYME software version 8.1.6 and analyzed with the Newton-Raphson algorithm. With the voltage plans taken from steady state simulation and transient stability tests, technical solutions have been proposed and implemented to improve the zone 2 power network stability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信