可再生能源并网率分析与计算方法

Sirui Zhu, Xiaofan Su, Shiyao Jiang, Yuzheng Xie, Sijing He
{"title":"可再生能源并网率分析与计算方法","authors":"Sirui Zhu, Xiaofan Su, Shiyao Jiang, Yuzheng Xie, Sijing He","doi":"10.1109/IAEAC54830.2022.9930094","DOIUrl":null,"url":null,"abstract":"The increasing proportion of renewable energy participating in power systems brings new challenges to power system planning. It requires power planning to consider the uncertain impact of the high proportion of renewable energy. In this paper, a method for analyzing and calculating the simultaneity rate of renewable energy output is proposed considering the abandoned power. By analyzing the actual operation data of renewable energy, the corresponding output simultaneity rate of each data point is calculated. Then, the annual simultaneity rate of renewable energy output is calculated considering the requirement of the abandoned power rate. Finally, a provincial power grid is used to verify the effectiveness and adaptability of the proposed method, which helps improve the rationality of the power grid reinforcement scheme. The method is used in routine production and power grid planning work.","PeriodicalId":349113,"journal":{"name":"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis and Calculation Method of Simultaneity Rate of Renewable Energy Output\",\"authors\":\"Sirui Zhu, Xiaofan Su, Shiyao Jiang, Yuzheng Xie, Sijing He\",\"doi\":\"10.1109/IAEAC54830.2022.9930094\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The increasing proportion of renewable energy participating in power systems brings new challenges to power system planning. It requires power planning to consider the uncertain impact of the high proportion of renewable energy. In this paper, a method for analyzing and calculating the simultaneity rate of renewable energy output is proposed considering the abandoned power. By analyzing the actual operation data of renewable energy, the corresponding output simultaneity rate of each data point is calculated. Then, the annual simultaneity rate of renewable energy output is calculated considering the requirement of the abandoned power rate. Finally, a provincial power grid is used to verify the effectiveness and adaptability of the proposed method, which helps improve the rationality of the power grid reinforcement scheme. The method is used in routine production and power grid planning work.\",\"PeriodicalId\":349113,\"journal\":{\"name\":\"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )\",\"volume\":\"63 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAEAC54830.2022.9930094\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAEAC54830.2022.9930094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

可再生能源参与电力系统的比例不断提高,给电力系统规划带来了新的挑战。它要求电力规划考虑可再生能源高比例的不确定影响。本文提出了一种考虑弃电的可再生能源并网率分析计算方法。通过对可再生能源实际运行数据的分析,计算出各数据点对应的输出同步率。然后,考虑弃电率要求,计算可再生能源年发电量同步率。最后,以一个省级电网为例,验证了所提方法的有效性和适应性,提高了电网加固方案的合理性。该方法已应用于日常生产和电网规划工作中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis and Calculation Method of Simultaneity Rate of Renewable Energy Output
The increasing proportion of renewable energy participating in power systems brings new challenges to power system planning. It requires power planning to consider the uncertain impact of the high proportion of renewable energy. In this paper, a method for analyzing and calculating the simultaneity rate of renewable energy output is proposed considering the abandoned power. By analyzing the actual operation data of renewable energy, the corresponding output simultaneity rate of each data point is calculated. Then, the annual simultaneity rate of renewable energy output is calculated considering the requirement of the abandoned power rate. Finally, a provincial power grid is used to verify the effectiveness and adaptability of the proposed method, which helps improve the rationality of the power grid reinforcement scheme. The method is used in routine production and power grid planning work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信