{"title":"基于TRIZ的改造工程质量控制研究","authors":"Lingyun Qi, Jinkui Wang, Haoli Wang","doi":"10.1109/ICDSBA48748.2019.00105","DOIUrl":null,"url":null,"abstract":"The transformation project is easy to be concealed. In engineering practice, the emergence of concealed works is mostly due to technical reasons, and the control measures in advance for concealed works are often insufficient. Aiming at these problems, this paper will build a quality control model of concealed works based on TRIZ, obtain a kind of control measures in advance, improve the content of technical preparation, in order to reduce the emergence of concealed works and solve the shortage of quality control. Finally, the model is applied to the quality control of the monitoring system transformation project of Chengdu detention center.","PeriodicalId":382429,"journal":{"name":"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Quality Control of Reconstruction Project Based on TRIZ\",\"authors\":\"Lingyun Qi, Jinkui Wang, Haoli Wang\",\"doi\":\"10.1109/ICDSBA48748.2019.00105\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The transformation project is easy to be concealed. In engineering practice, the emergence of concealed works is mostly due to technical reasons, and the control measures in advance for concealed works are often insufficient. Aiming at these problems, this paper will build a quality control model of concealed works based on TRIZ, obtain a kind of control measures in advance, improve the content of technical preparation, in order to reduce the emergence of concealed works and solve the shortage of quality control. Finally, the model is applied to the quality control of the monitoring system transformation project of Chengdu detention center.\",\"PeriodicalId\":382429,\"journal\":{\"name\":\"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICDSBA48748.2019.00105\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDSBA48748.2019.00105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Quality Control of Reconstruction Project Based on TRIZ
The transformation project is easy to be concealed. In engineering practice, the emergence of concealed works is mostly due to technical reasons, and the control measures in advance for concealed works are often insufficient. Aiming at these problems, this paper will build a quality control model of concealed works based on TRIZ, obtain a kind of control measures in advance, improve the content of technical preparation, in order to reduce the emergence of concealed works and solve the shortage of quality control. Finally, the model is applied to the quality control of the monitoring system transformation project of Chengdu detention center.