R. Fonteijn, T. V. Cuijk, P. Nguyen, J. Morren, J. Slootweg
{"title":"拥塞管理的灵活性:多机制方法的演示","authors":"R. Fonteijn, T. V. Cuijk, P. Nguyen, J. Morren, J. Slootweg","doi":"10.1109/ISGTEurope.2018.8571896","DOIUrl":null,"url":null,"abstract":"Distribution system operators are investigating new methods to manage network congestion and avoid overloading. Among these methods is the application of flexibility. This paper will present a field implementation as part of the H2020 Interflex project. Two parallel mechanisms will be implemented: a local flexibility market and a variable connection capacity. Multiple aggregators will participate on the local flexibility market, trading flexibility day-ahead and intraday. The DSO can compete for flexibility with other interested parties. In parallel, the concept of variable connection capacity is implemented. The variable connection capacity is based on a contractual agreement between distribution system operator and a customer's point of connection. The connection capacity is set at two levels: off- and on-peak. The scenarios include medium to low voltage transformers and low voltage feeders. In the paper, various test-scenarios are described, and an outlook of the field experiments is provided.","PeriodicalId":302863,"journal":{"name":"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Flexibility for congestion management: A demonstration of a multi-mechanism approach\",\"authors\":\"R. Fonteijn, T. V. Cuijk, P. Nguyen, J. Morren, J. Slootweg\",\"doi\":\"10.1109/ISGTEurope.2018.8571896\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Distribution system operators are investigating new methods to manage network congestion and avoid overloading. Among these methods is the application of flexibility. This paper will present a field implementation as part of the H2020 Interflex project. Two parallel mechanisms will be implemented: a local flexibility market and a variable connection capacity. Multiple aggregators will participate on the local flexibility market, trading flexibility day-ahead and intraday. The DSO can compete for flexibility with other interested parties. In parallel, the concept of variable connection capacity is implemented. The variable connection capacity is based on a contractual agreement between distribution system operator and a customer's point of connection. The connection capacity is set at two levels: off- and on-peak. The scenarios include medium to low voltage transformers and low voltage feeders. In the paper, various test-scenarios are described, and an outlook of the field experiments is provided.\",\"PeriodicalId\":302863,\"journal\":{\"name\":\"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)\",\"volume\":\"60 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2018.8571896\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2018.8571896","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Flexibility for congestion management: A demonstration of a multi-mechanism approach
Distribution system operators are investigating new methods to manage network congestion and avoid overloading. Among these methods is the application of flexibility. This paper will present a field implementation as part of the H2020 Interflex project. Two parallel mechanisms will be implemented: a local flexibility market and a variable connection capacity. Multiple aggregators will participate on the local flexibility market, trading flexibility day-ahead and intraday. The DSO can compete for flexibility with other interested parties. In parallel, the concept of variable connection capacity is implemented. The variable connection capacity is based on a contractual agreement between distribution system operator and a customer's point of connection. The connection capacity is set at two levels: off- and on-peak. The scenarios include medium to low voltage transformers and low voltage feeders. In the paper, various test-scenarios are described, and an outlook of the field experiments is provided.