东爪哇省pacitan regency的能源系统设计

S. Widiyanto, Etika Nur’aini, Dony Anggit Sasmito
{"title":"东爪哇省pacitan regency的能源系统设计","authors":"S. Widiyanto, Etika Nur’aini, Dony Anggit Sasmito","doi":"10.22146/ajse.v5i1.65414","DOIUrl":null,"url":null,"abstract":"Planning the construction of renewable energy plants in Pacitan district addresses the increasing electricity needs every year. Pacitan Regency is located on the coast with natural conditions in most of the mountains; there is a lot of renewable energy potentials such as water,  wind and sunlight. Based on data from the central statistics agency of Pacitan district with the population increased by 0.18%/year. The energy system planning in this study allocates 70% of renewable energy generation and 30% of fossil plants by 2030.Projected availability of steam power plants with installed capacity of 2 x 315 MW, power capable of 560 MW. The distribution of renewable energy power plants is spread in the Pacitan area with hydroelectric power plants with a total target of at least 412 MW by 2025 and Pump Storage power plants with a total target of at least 1000 MW by 2025. Solar power plants have the potential of intensity radiation 4300 Wh/m2; the average air temperature is 32.5 0C and Solar Radiation 38.71%. Electricity generation waste power with a total target capacity of at least 84 MW. Wind potential with an average speed of 9 m/s. By 2030, the population of Pacitan district will reach 566,413 people, with an energy consumption of 843.85 kWh/capita; the demand required is 187,613 Mwh. By reducing the use of power plants from 100% to 30% can reduce CO^2 emissions to 125,419,390,667 Tons.","PeriodicalId":280593,"journal":{"name":"ASEAN Journal of Systems Engineering","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ENERGY SYSTEM DESIGN IN PACITAN REGENCY-EAST JAVA PROVINCE\",\"authors\":\"S. Widiyanto, Etika Nur’aini, Dony Anggit Sasmito\",\"doi\":\"10.22146/ajse.v5i1.65414\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Planning the construction of renewable energy plants in Pacitan district addresses the increasing electricity needs every year. Pacitan Regency is located on the coast with natural conditions in most of the mountains; there is a lot of renewable energy potentials such as water,  wind and sunlight. Based on data from the central statistics agency of Pacitan district with the population increased by 0.18%/year. The energy system planning in this study allocates 70% of renewable energy generation and 30% of fossil plants by 2030.Projected availability of steam power plants with installed capacity of 2 x 315 MW, power capable of 560 MW. The distribution of renewable energy power plants is spread in the Pacitan area with hydroelectric power plants with a total target of at least 412 MW by 2025 and Pump Storage power plants with a total target of at least 1000 MW by 2025. Solar power plants have the potential of intensity radiation 4300 Wh/m2; the average air temperature is 32.5 0C and Solar Radiation 38.71%. Electricity generation waste power with a total target capacity of at least 84 MW. Wind potential with an average speed of 9 m/s. By 2030, the population of Pacitan district will reach 566,413 people, with an energy consumption of 843.85 kWh/capita; the demand required is 187,613 Mwh. By reducing the use of power plants from 100% to 30% can reduce CO^2 emissions to 125,419,390,667 Tons.\",\"PeriodicalId\":280593,\"journal\":{\"name\":\"ASEAN Journal of Systems Engineering\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASEAN Journal of Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22146/ajse.v5i1.65414\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Journal of Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/ajse.v5i1.65414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

计划在太平洋地区建设可再生能源工厂,以解决每年不断增长的电力需求。太平洋摄政地处沿海,自然条件优越,多山;有很多可再生能源的潜力,如水、风和阳光。根据太平洋地区中央统计局的数据,人口以每年0.18%的速度增长。本研究中的能源系统规划,到2030年可再生能源发电量占70%,化石电厂占30%。预计可用的蒸汽发电厂装机容量为2 × 315兆瓦,功率可达560兆瓦。可再生能源发电厂分布在太平洋地区,其中水力发电厂的总目标是到2025年至少达到412兆瓦,抽水蓄能发电厂的总目标是到2025年至少达到1000兆瓦。太阳能电站的潜在辐射强度为4300 Wh/m2;平均气温32.5℃,太阳辐射38.71%。发电废物发电,总目标容量至少为84兆瓦。平均风速为9米/秒。到2030年,太平洋地区人口将达到566,413人,人均能耗为843.85千瓦时;需求为187,613兆瓦时。通过将发电厂的使用从100%减少到30%,可以将二氧化碳排放量减少到125,419,390,667吨。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ENERGY SYSTEM DESIGN IN PACITAN REGENCY-EAST JAVA PROVINCE
Planning the construction of renewable energy plants in Pacitan district addresses the increasing electricity needs every year. Pacitan Regency is located on the coast with natural conditions in most of the mountains; there is a lot of renewable energy potentials such as water,  wind and sunlight. Based on data from the central statistics agency of Pacitan district with the population increased by 0.18%/year. The energy system planning in this study allocates 70% of renewable energy generation and 30% of fossil plants by 2030.Projected availability of steam power plants with installed capacity of 2 x 315 MW, power capable of 560 MW. The distribution of renewable energy power plants is spread in the Pacitan area with hydroelectric power plants with a total target of at least 412 MW by 2025 and Pump Storage power plants with a total target of at least 1000 MW by 2025. Solar power plants have the potential of intensity radiation 4300 Wh/m2; the average air temperature is 32.5 0C and Solar Radiation 38.71%. Electricity generation waste power with a total target capacity of at least 84 MW. Wind potential with an average speed of 9 m/s. By 2030, the population of Pacitan district will reach 566,413 people, with an energy consumption of 843.85 kWh/capita; the demand required is 187,613 Mwh. By reducing the use of power plants from 100% to 30% can reduce CO^2 emissions to 125,419,390,667 Tons.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信