{"title":"使用自动机器引导的土方工程的位置感知实时仿真框架","authors":"F. Vahdatikhaki, S. Setayeshgar, A. Hammad","doi":"10.1109/WSC.2013.6721676","DOIUrl":null,"url":null,"abstract":"The cost-and-time-optimized planning of earthmoving projects has been significantly boosted as a result of deploying simulation techniques which enable project managers to effectively comprehend the behavior of projects. However, the realism and accuracy of the simulation models diminish as a result of the heavy reliance on the statistical data and of not taking into account the context-specific features of the project. Similarly, the more unique the characteristics of projects and novel the construction methods, the less the possibility of retrofitting a historic pattern to new projects. On the other hand, the identification of potential accidents on construction sites has been a major concern in the construction industry. To address these issues, this research proposes a framework based on the integration of new tracking technologies used in Automated Machine Guidance (AMG) with a real-time simulation technique. A prototype is developed to test and demonstrate the effectiveness of the proposed approach.","PeriodicalId":223717,"journal":{"name":"2013 Winter Simulations Conference (WSC)","volume":"80 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Location-aware real-time simulation framework for earthmoving projects using automated machine guidance\",\"authors\":\"F. Vahdatikhaki, S. Setayeshgar, A. Hammad\",\"doi\":\"10.1109/WSC.2013.6721676\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The cost-and-time-optimized planning of earthmoving projects has been significantly boosted as a result of deploying simulation techniques which enable project managers to effectively comprehend the behavior of projects. However, the realism and accuracy of the simulation models diminish as a result of the heavy reliance on the statistical data and of not taking into account the context-specific features of the project. Similarly, the more unique the characteristics of projects and novel the construction methods, the less the possibility of retrofitting a historic pattern to new projects. On the other hand, the identification of potential accidents on construction sites has been a major concern in the construction industry. To address these issues, this research proposes a framework based on the integration of new tracking technologies used in Automated Machine Guidance (AMG) with a real-time simulation technique. A prototype is developed to test and demonstrate the effectiveness of the proposed approach.\",\"PeriodicalId\":223717,\"journal\":{\"name\":\"2013 Winter Simulations Conference (WSC)\",\"volume\":\"80 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 Winter Simulations Conference (WSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC.2013.6721676\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Winter Simulations Conference (WSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2013.6721676","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

由于部署了仿真技术,使项目经理能够有效地理解项目的行为,因此土方工程的成本和时间优化规划得到了显着提高。然而,由于严重依赖统计数据和没有考虑到项目的具体环境特征,模拟模型的现实性和准确性降低了。同样,项目的特点越独特,施工方法越新颖,将历史模式改造成新项目的可能性就越小。另一方面,确定建筑工地的潜在事故一直是建造业关注的主要问题。为了解决这些问题,本研究提出了一个基于自动机器制导(AMG)中使用的新跟踪技术与实时仿真技术集成的框架。开发了一个原型来测试和证明所提出方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Location-aware real-time simulation framework for earthmoving projects using automated machine guidance
The cost-and-time-optimized planning of earthmoving projects has been significantly boosted as a result of deploying simulation techniques which enable project managers to effectively comprehend the behavior of projects. However, the realism and accuracy of the simulation models diminish as a result of the heavy reliance on the statistical data and of not taking into account the context-specific features of the project. Similarly, the more unique the characteristics of projects and novel the construction methods, the less the possibility of retrofitting a historic pattern to new projects. On the other hand, the identification of potential accidents on construction sites has been a major concern in the construction industry. To address these issues, this research proposes a framework based on the integration of new tracking technologies used in Automated Machine Guidance (AMG) with a real-time simulation technique. A prototype is developed to test and demonstrate the effectiveness of the proposed approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信