{"title":"Sidoarjo县Sidokare地区防洪综合城市排水管理","authors":"E. Cahya, Dani Eko Guntoro, D. Harisuseno","doi":"10.21776/ub.civense.2019.00202.3","DOIUrl":null,"url":null,"abstract":"F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.","PeriodicalId":432135,"journal":{"name":"Civil and Environmental Science","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Integrated Urban Drainage Management for Flood Inundation Controlling in Sidokare Area at Sidoarjo Regency\",\"authors\":\"E. Cahya, Dani Eko Guntoro, D. Harisuseno\",\"doi\":\"10.21776/ub.civense.2019.00202.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.\",\"PeriodicalId\":432135,\"journal\":{\"name\":\"Civil and Environmental Science\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and Environmental Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/ub.civense.2019.00202.3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and Environmental Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.civense.2019.00202.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
摘要
洪水和洪水每年都成为西多阿霍县的一个严重问题。本研究旨在将城市排水综合管理应用于西多阿若县西多阿若地区的洪水淹没控制。该综合排水管理方案包括缓凝池、排水通道的重新设计和水泵的利用。研究区分为Sidokare泵站、Sepande和Diponegoro街集水区。采用Mononobe公式分析历史洪水期间的降雨强度,采用Log Pearson Type III方法分析设计降雨量。分析结果表明,研究区历史洪涝是由降水引起的,降水周期为1.01年,降水强度为17.55 mm/h。研究还发现,通过在西九龙地区实施这种综合城市排水管理,洪水可以减少100%。对于sidokarepumpstation集水区,采用蓄水池、现有排水通道和现有防洪泵相结合的方式进行防洪管理。对于隔离集水区,采用蓄水池与现有排水通道相结合的方式进行管理。同时,利用新的洪水泵结合新的三级通道和现有排水通道解决了Diponegoro街集水区。
Integrated Urban Drainage Management for Flood Inundation Controlling in Sidokare Area at Sidoarjo Regency
F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.