Sidoarjo县Sidokare地区防洪综合城市排水管理

E. Cahya, Dani Eko Guntoro, D. Harisuseno
{"title":"Sidoarjo县Sidokare地区防洪综合城市排水管理","authors":"E. Cahya, Dani Eko Guntoro, D. Harisuseno","doi":"10.21776/ub.civense.2019.00202.3","DOIUrl":null,"url":null,"abstract":"F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.","PeriodicalId":432135,"journal":{"name":"Civil and Environmental Science","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Integrated Urban Drainage Management for Flood Inundation Controlling in Sidokare Area at Sidoarjo Regency\",\"authors\":\"E. Cahya, Dani Eko Guntoro, D. Harisuseno\",\"doi\":\"10.21776/ub.civense.2019.00202.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.\",\"PeriodicalId\":432135,\"journal\":{\"name\":\"Civil and Environmental Science\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and Environmental Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/ub.civense.2019.00202.3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and Environmental Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.civense.2019.00202.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

洪水和洪水每年都成为西多阿霍县的一个严重问题。本研究旨在将城市排水综合管理应用于西多阿若县西多阿若地区的洪水淹没控制。该综合排水管理方案包括缓凝池、排水通道的重新设计和水泵的利用。研究区分为Sidokare泵站、Sepande和Diponegoro街集水区。采用Mononobe公式分析历史洪水期间的降雨强度,采用Log Pearson Type III方法分析设计降雨量。分析结果表明,研究区历史洪涝是由降水引起的,降水周期为1.01年,降水强度为17.55 mm/h。研究还发现,通过在西九龙地区实施这种综合城市排水管理,洪水可以减少100%。对于sidokarepumpstation集水区,采用蓄水池、现有排水通道和现有防洪泵相结合的方式进行防洪管理。对于隔离集水区,采用蓄水池与现有排水通道相结合的方式进行管理。同时,利用新的洪水泵结合新的三级通道和现有排水通道解决了Diponegoro街集水区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Urban Drainage Management for Flood Inundation Controlling in Sidokare Area at Sidoarjo Regency
F lood and inundation had become a serious problem in Sidoarjo Regency annually. This study aimed to apply integrated urban drainage management for flood inundation controlling at Sidokare Region in Sidoarjo Regency. This integrated drainage management consisted of retarding pond, drainage channel redesign, and pump utilization. The study region was divided into Sidokare Pump station, Sepande, and Diponegoro Street catchment area. Rainfall intensity during historical floods was analysed using Mononobe formula and Log Pearson Type III method was used to analyze design rainfall. From the result of the analysis, it wasfoundthat thehistoricalfloodsinstudyregioncausedbyrainfall withreturnperiodof1.01 years, with rainfall intensity of 17.55 mm/hour. It was also found that by implementing this integratedurbandrainagemanagementatSidokareRegion,floodcouldbereducedupto100%. ForSidokarePumpStationcatchmentarea,theinundationmanagementwasconductedbyusing combination of storage pool, existing drainage channel, and the existing flood pump. For Sepandecatchmentarea,itwasmanagedtousethecombinationofstoragepoolandtheexisting drainage channel. Meanwhile, Diponegoro Street catchment area was solved by utilizing new flood pump combining with new tertiary channel and existing drainagechannel.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信