具有故障交互作用的双组份并联系统维修成本分析

R. I. Zequeira, C. Bérenguer
{"title":"具有故障交互作用的双组份并联系统维修成本分析","authors":"R. I. Zequeira, C. Bérenguer","doi":"10.1109/RAMS.2004.1285451","DOIUrl":null,"url":null,"abstract":"We consider a two-component standby system which can successfully operate upon a demand if at least one component is not failed. Component failures can occur randomly but are detected only by periodic testing or inspections. We suppose that tests or inspections are staggered. If a component is found failed a corrective maintenance action is made. Besides periodic inspections, preventive maintenance actions are scheduled for the system at a fixed time after the last preventive or corrective maintenance action. We show that when there is failure interaction and both components are not identically distributed the choice of the first component to inspect to obtain the minimum cost rate depends on the degree of s-dependence between components lifetimes. Numerical experiments presented show that not to consider the failure interaction when it exists might lead to important underestimations of the cost rate. Besides, this underestimations seem to be more important as the expected cost per unit time of unavailability increases.","PeriodicalId":270494,"journal":{"name":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Maintenance cost analysis of a two-component parallel system with failure interaction\",\"authors\":\"R. I. Zequeira, C. Bérenguer\",\"doi\":\"10.1109/RAMS.2004.1285451\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider a two-component standby system which can successfully operate upon a demand if at least one component is not failed. Component failures can occur randomly but are detected only by periodic testing or inspections. We suppose that tests or inspections are staggered. If a component is found failed a corrective maintenance action is made. Besides periodic inspections, preventive maintenance actions are scheduled for the system at a fixed time after the last preventive or corrective maintenance action. We show that when there is failure interaction and both components are not identically distributed the choice of the first component to inspect to obtain the minimum cost rate depends on the degree of s-dependence between components lifetimes. Numerical experiments presented show that not to consider the failure interaction when it exists might lead to important underestimations of the cost rate. Besides, this underestimations seem to be more important as the expected cost per unit time of unavailability increases.\",\"PeriodicalId\":270494,\"journal\":{\"name\":\"Annual Symposium Reliability and Maintainability, 2004 - RAMS\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-08-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annual Symposium Reliability and Maintainability, 2004 - RAMS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RAMS.2004.1285451\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2004.1285451","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

我们考虑一个双组件备用系统,如果至少一个组件没有故障,则该系统可以根据需求成功运行。组件故障可能随机发生,但只有通过定期测试或检查才能检测到。我们假定测试或检查是错开的。如果发现某个部件出现故障,则采取纠正性维护措施。除定期检查外,预防性维护行动是在上次预防性或纠正性维护行动后的固定时间对系统进行的计划维护。我们表明,当存在故障交互且两个部件的分布不相同时,为了获得最小的成本率而选择第一个部件进行检查取决于部件寿命之间的s依赖程度。数值实验表明,如果不考虑失效相互作用的存在,可能会导致成本率的严重低估。此外,随着单位不可用时间的预期成本增加,这种低估似乎更为重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maintenance cost analysis of a two-component parallel system with failure interaction
We consider a two-component standby system which can successfully operate upon a demand if at least one component is not failed. Component failures can occur randomly but are detected only by periodic testing or inspections. We suppose that tests or inspections are staggered. If a component is found failed a corrective maintenance action is made. Besides periodic inspections, preventive maintenance actions are scheduled for the system at a fixed time after the last preventive or corrective maintenance action. We show that when there is failure interaction and both components are not identically distributed the choice of the first component to inspect to obtain the minimum cost rate depends on the degree of s-dependence between components lifetimes. Numerical experiments presented show that not to consider the failure interaction when it exists might lead to important underestimations of the cost rate. Besides, this underestimations seem to be more important as the expected cost per unit time of unavailability increases.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信