{"title":"直接负荷控制下非抢占柔性负荷的调度、定价和效率","authors":"Abhishek K. Gupta, R. Jain, R. Rajagopal","doi":"10.1109/ALLERTON.2015.7447118","DOIUrl":null,"url":null,"abstract":"A market comprising a scheduler with a renewable generator and a pumped water storage system, a certain number of flexible and inflexible loads, and a non-renewable generator is considered. At the beginning of activity, the scheduler receives the following three information from each of the loads - consumption (in MW), duration (in hours) and start window. The start window of a load is the time interval in which the load must be started. A load is inflexible if its start window is singleton. The loads are assumed to be non-preemptive, that is, after a load is started, it cannot be interrupted or paused, and it must be served for its duration. The goal of the scheduler is to develop a scheduling policy that minimizes the aggregate cost of buying electricity from the non-renewable generator. We develop an understanding of the nature of optimal solutions to such an optimization problem and propose an approximately optimal scheduling policy for a sufficiently wide class of scheduling problems.","PeriodicalId":112948,"journal":{"name":"2015 53rd Annual Allerton Conference on Communication, Control, and Computing (Allerton)","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Scheduling, pricing, and efficiency of non-preemptive flexible loads under direct load control\",\"authors\":\"Abhishek K. Gupta, R. Jain, R. Rajagopal\",\"doi\":\"10.1109/ALLERTON.2015.7447118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A market comprising a scheduler with a renewable generator and a pumped water storage system, a certain number of flexible and inflexible loads, and a non-renewable generator is considered. At the beginning of activity, the scheduler receives the following three information from each of the loads - consumption (in MW), duration (in hours) and start window. The start window of a load is the time interval in which the load must be started. A load is inflexible if its start window is singleton. The loads are assumed to be non-preemptive, that is, after a load is started, it cannot be interrupted or paused, and it must be served for its duration. The goal of the scheduler is to develop a scheduling policy that minimizes the aggregate cost of buying electricity from the non-renewable generator. We develop an understanding of the nature of optimal solutions to such an optimization problem and propose an approximately optimal scheduling policy for a sufficiently wide class of scheduling problems.\",\"PeriodicalId\":112948,\"journal\":{\"name\":\"2015 53rd Annual Allerton Conference on Communication, Control, and Computing (Allerton)\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 53rd Annual Allerton Conference on Communication, Control, and Computing (Allerton)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ALLERTON.2015.7447118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 53rd Annual Allerton Conference on Communication, Control, and Computing (Allerton)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ALLERTON.2015.7447118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling, pricing, and efficiency of non-preemptive flexible loads under direct load control
A market comprising a scheduler with a renewable generator and a pumped water storage system, a certain number of flexible and inflexible loads, and a non-renewable generator is considered. At the beginning of activity, the scheduler receives the following three information from each of the loads - consumption (in MW), duration (in hours) and start window. The start window of a load is the time interval in which the load must be started. A load is inflexible if its start window is singleton. The loads are assumed to be non-preemptive, that is, after a load is started, it cannot be interrupted or paused, and it must be served for its duration. The goal of the scheduler is to develop a scheduling policy that minimizes the aggregate cost of buying electricity from the non-renewable generator. We develop an understanding of the nature of optimal solutions to such an optimization problem and propose an approximately optimal scheduling policy for a sufficiently wide class of scheduling problems.