在精益和敏捷建设过程中传递和共享隐性知识的关键因素

M. Saini, M. Arif, D. Kulonda
{"title":"在精益和敏捷建设过程中传递和共享隐性知识的关键因素","authors":"M. Saini, M. Arif, D. Kulonda","doi":"10.1108/CI-06-2016-0036","DOIUrl":null,"url":null,"abstract":"Purpose \n \n \n \n \nThe purpose of the paper is to investigate the critical success factors (CSFs) associated with the effectiveness of transfer and sharing of tacit knowledge in lean and agile construction processes. \n \n \n \n \nDesign/methodology/approach \n \n \n \n \nThe study identifies ten CSFs that initiate the transferring and sharing of tacit knowledge. The CSFs are validated through quantitative study. This study recruited project managers, executives, consultants and other managers that are directly involved in the management of a construction project. It recruits the respondents those have background and experience from disciplines such as lean construction, agile construction, construction supply chain (CSC) and knowledge management in lean, agile and CSC. The data collected through self-administrative questionnaire are categorised as ordinal data to analyse in SPSS with frequency and Kruskal–Wallis H test, Spearman’s correlation analysis and a rank-order analysis is done to establish the level of importance of those factors. \n \n \n \n \nFindings \n \n \n \n \nInitially, “Trust between construction organisations” is identified as the foremost CSF. Moreover, other CSFs such as motivation, leadership capabilities, business strategies and organisational capabilities follow trust. \n \n \n \n \nOriginality/value \n \n \n \n \nThis is the first study that investigates and establishes the CSFs that are essential to initiate transferring and sharing tacit knowledge in a lean and in an agile construction processes.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"43","resultStr":"{\"title\":\"Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes\",\"authors\":\"M. Saini, M. Arif, D. Kulonda\",\"doi\":\"10.1108/CI-06-2016-0036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose \\n \\n \\n \\n \\nThe purpose of the paper is to investigate the critical success factors (CSFs) associated with the effectiveness of transfer and sharing of tacit knowledge in lean and agile construction processes. \\n \\n \\n \\n \\nDesign/methodology/approach \\n \\n \\n \\n \\nThe study identifies ten CSFs that initiate the transferring and sharing of tacit knowledge. The CSFs are validated through quantitative study. This study recruited project managers, executives, consultants and other managers that are directly involved in the management of a construction project. It recruits the respondents those have background and experience from disciplines such as lean construction, agile construction, construction supply chain (CSC) and knowledge management in lean, agile and CSC. The data collected through self-administrative questionnaire are categorised as ordinal data to analyse in SPSS with frequency and Kruskal–Wallis H test, Spearman’s correlation analysis and a rank-order analysis is done to establish the level of importance of those factors. \\n \\n \\n \\n \\nFindings \\n \\n \\n \\n \\nInitially, “Trust between construction organisations” is identified as the foremost CSF. Moreover, other CSFs such as motivation, leadership capabilities, business strategies and organisational capabilities follow trust. \\n \\n \\n \\n \\nOriginality/value \\n \\n \\n \\n \\nThis is the first study that investigates and establishes the CSFs that are essential to initiate transferring and sharing tacit knowledge in a lean and in an agile construction processes.\",\"PeriodicalId\":221945,\"journal\":{\"name\":\"Construction Innovation: Information, Process, Management\",\"volume\":\"64 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"43\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation: Information, Process, Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/CI-06-2016-0036\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CI-06-2016-0036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 43

摘要

本文的目的是研究与精益敏捷建设过程中隐性知识转移和共享有效性相关的关键成功因素。设计/方法/方法本研究确定了10个启动隐性知识转移和共享的企业文化框架。通过定量研究验证了csf的有效性。本研究招募了项目经理、高管、顾问和其他直接参与建设项目管理的管理人员。招募具有精益建设、敏捷建设、建筑供应链(CSC)、精益、敏捷、CSC知识管理等学科背景和经验的受访者。通过自我管理问卷收集的数据归类为有序数据,在SPSS中进行频率和Kruskal-Wallis H检验,Spearman相关分析和秩序分析,以确定这些因素的重要程度。最初,“建筑机构之间的信任”被确定为最重要的CSF。此外,动机、领导能力、商业战略和组织能力等其他csr也遵循信任。原创性/价值这是第一个调查和建立在精益和敏捷建设过程中启动传递和共享隐性知识所必需的csf的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes
Purpose The purpose of the paper is to investigate the critical success factors (CSFs) associated with the effectiveness of transfer and sharing of tacit knowledge in lean and agile construction processes. Design/methodology/approach The study identifies ten CSFs that initiate the transferring and sharing of tacit knowledge. The CSFs are validated through quantitative study. This study recruited project managers, executives, consultants and other managers that are directly involved in the management of a construction project. It recruits the respondents those have background and experience from disciplines such as lean construction, agile construction, construction supply chain (CSC) and knowledge management in lean, agile and CSC. The data collected through self-administrative questionnaire are categorised as ordinal data to analyse in SPSS with frequency and Kruskal–Wallis H test, Spearman’s correlation analysis and a rank-order analysis is done to establish the level of importance of those factors. Findings Initially, “Trust between construction organisations” is identified as the foremost CSF. Moreover, other CSFs such as motivation, leadership capabilities, business strategies and organisational capabilities follow trust. Originality/value This is the first study that investigates and establishes the CSFs that are essential to initiate transferring and sharing tacit knowledge in a lean and in an agile construction processes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信