基于联赛冠军算法的154/34,5 kV hasanelebi变电站过流继电器协调

Abubekir Seyyarer, Ozan Akdağ, Cengiz Hark, A. Karcı, C. Yeroğlu
{"title":"基于联赛冠军算法的154/34,5 kV hasanelebi变电站过流继电器协调","authors":"Abubekir Seyyarer, Ozan Akdağ, Cengiz Hark, A. Karcı, C. Yeroğlu","doi":"10.1109/IDAP.2017.8090260","DOIUrl":null,"url":null,"abstract":"In this study, non-directional overcurrent relay coordination was done in 154/34.5 kV Malatya Teiaş Hasançelebi transformer centre using League Championship Algorithm (LCA). Standard inverse time characteristic based on IEC 255-3 is used for the relay is coordinated. The results obtained by the LCA have been used in virtual model, obtained by DigSilent software for overcurrent relays at the Hasançelebi transformer centre. Then, the overcurrent relay coordination was performed by examining the response of the overcurrent relays to the 3-phase fault currents generated in the model.","PeriodicalId":111721,"journal":{"name":"2017 International Artificial Intelligence and Data Processing Symposium (IDAP)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Overcurrent relay coordination of 154/34,5 kV Hasançelebi substation by league championship algorithm\",\"authors\":\"Abubekir Seyyarer, Ozan Akdağ, Cengiz Hark, A. Karcı, C. Yeroğlu\",\"doi\":\"10.1109/IDAP.2017.8090260\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, non-directional overcurrent relay coordination was done in 154/34.5 kV Malatya Teiaş Hasançelebi transformer centre using League Championship Algorithm (LCA). Standard inverse time characteristic based on IEC 255-3 is used for the relay is coordinated. The results obtained by the LCA have been used in virtual model, obtained by DigSilent software for overcurrent relays at the Hasançelebi transformer centre. Then, the overcurrent relay coordination was performed by examining the response of the overcurrent relays to the 3-phase fault currents generated in the model.\",\"PeriodicalId\":111721,\"journal\":{\"name\":\"2017 International Artificial Intelligence and Data Processing Symposium (IDAP)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Artificial Intelligence and Data Processing Symposium (IDAP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IDAP.2017.8090260\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Artificial Intelligence and Data Processing Symposium (IDAP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IDAP.2017.8090260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究采用联赛冠军算法(LCA)对154/34.5 kV Malatya teiaku hasanelebi变压器中心进行了无方向过流继电器协调。继电器协调采用基于IEC 255-3的标准逆时特性。LCA计算结果已应用于DigSilent软件建立的hasan elebi变压器中心过流继电器的虚拟模型。然后,通过检测过流继电器对模型中产生的三相故障电流的响应,进行过流继电器协调。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Overcurrent relay coordination of 154/34,5 kV Hasançelebi substation by league championship algorithm
In this study, non-directional overcurrent relay coordination was done in 154/34.5 kV Malatya Teiaş Hasançelebi transformer centre using League Championship Algorithm (LCA). Standard inverse time characteristic based on IEC 255-3 is used for the relay is coordinated. The results obtained by the LCA have been used in virtual model, obtained by DigSilent software for overcurrent relays at the Hasançelebi transformer centre. Then, the overcurrent relay coordination was performed by examining the response of the overcurrent relays to the 3-phase fault currents generated in the model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信