{"title":"基于LS-SVM的短期电力负荷预测","authors":"L. Bin, Xuefeng Guang","doi":"10.1109/ISME.2010.86","DOIUrl":null,"url":null,"abstract":"In order to solve the Short-term Load Forecasting problems in Power Systems, this article puts forward the Least Squares Support Vector Machine’s improved model by selecting the appropriate Gauss kernel function and proposing the error calculation analytical method, thus reduces the computational complicate problems when large amount of data is input in Short-term Power Load Forecasting. An example is given to prove the validity of the algorithm.","PeriodicalId":348878,"journal":{"name":"2010 International Conference of Information Science and Management Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Short-Term Power Load Forecasting Based on LS-SVM\",\"authors\":\"L. Bin, Xuefeng Guang\",\"doi\":\"10.1109/ISME.2010.86\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to solve the Short-term Load Forecasting problems in Power Systems, this article puts forward the Least Squares Support Vector Machine’s improved model by selecting the appropriate Gauss kernel function and proposing the error calculation analytical method, thus reduces the computational complicate problems when large amount of data is input in Short-term Power Load Forecasting. An example is given to prove the validity of the algorithm.\",\"PeriodicalId\":348878,\"journal\":{\"name\":\"2010 International Conference of Information Science and Management Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference of Information Science and Management Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISME.2010.86\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference of Information Science and Management Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISME.2010.86","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In order to solve the Short-term Load Forecasting problems in Power Systems, this article puts forward the Least Squares Support Vector Machine’s improved model by selecting the appropriate Gauss kernel function and proposing the error calculation analytical method, thus reduces the computational complicate problems when large amount of data is input in Short-term Power Load Forecasting. An example is given to prove the validity of the algorithm.