{"title":"具有可重入作业的双目标流水车间调度问题的混合遗传算法","authors":"C. K. Lee, D. Lin","doi":"10.1109/IEEM.2010.5674366","DOIUrl":null,"url":null,"abstract":"This paper presents a simulated genetic algorithm model of scheduling the flow shop problems with re-entrant jobs. The objectives of this research are to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines with the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are required to reenter to the flow shop. The tardiness weight is adjusted once the jobs re-enter the shop. The performance of the proposed GA model is verified by a number of numerical experiments where the data come from the case company. The results show the proposed method has a higher order satisfaction rate than the industrial practices.","PeriodicalId":285694,"journal":{"name":"2010 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Hybrid genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs\",\"authors\":\"C. K. Lee, D. Lin\",\"doi\":\"10.1109/IEEM.2010.5674366\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a simulated genetic algorithm model of scheduling the flow shop problems with re-entrant jobs. The objectives of this research are to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines with the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are required to reenter to the flow shop. The tardiness weight is adjusted once the jobs re-enter the shop. The performance of the proposed GA model is verified by a number of numerical experiments where the data come from the case company. The results show the proposed method has a higher order satisfaction rate than the industrial practices.\",\"PeriodicalId\":285694,\"journal\":{\"name\":\"2010 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2010.5674366\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2010.5674366","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Hybrid genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
This paper presents a simulated genetic algorithm model of scheduling the flow shop problems with re-entrant jobs. The objectives of this research are to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines with the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are required to reenter to the flow shop. The tardiness weight is adjusted once the jobs re-enter the shop. The performance of the proposed GA model is verified by a number of numerical experiments where the data come from the case company. The results show the proposed method has a higher order satisfaction rate than the industrial practices.