{"title":"基于res的电厂选址地理信息系统","authors":"S. Rokas, T. Ktenidis, E. Kondili, J. Kaldellis","doi":"10.1109/ICCEP.2011.6036269","DOIUrl":null,"url":null,"abstract":"One of the main reasons for the delay of renewable energy sources (RES) applications in Greece is the difficulty of finding a proper location for their installation that will satisfy the required specifications. The situation is further aggravated by the lack of an integrated decision support tool, taking into consideration all the parameters affecting the optimum siting of similar power stations. In this context, the main aim of the current work is to develop an appropriate siting procedure on the basis of geographical information systems, taking into consideration the main parameters affecting the best choice of a new RES power station ands using as a test case study the island of Syros in the Aegean Sea.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"RES-based power plants siting using geographical information systems\",\"authors\":\"S. Rokas, T. Ktenidis, E. Kondili, J. Kaldellis\",\"doi\":\"10.1109/ICCEP.2011.6036269\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the main reasons for the delay of renewable energy sources (RES) applications in Greece is the difficulty of finding a proper location for their installation that will satisfy the required specifications. The situation is further aggravated by the lack of an integrated decision support tool, taking into consideration all the parameters affecting the optimum siting of similar power stations. In this context, the main aim of the current work is to develop an appropriate siting procedure on the basis of geographical information systems, taking into consideration the main parameters affecting the best choice of a new RES power station ands using as a test case study the island of Syros in the Aegean Sea.\",\"PeriodicalId\":403158,\"journal\":{\"name\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCEP.2011.6036269\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036269","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

希腊可再生能源(RES)应用延迟的主要原因之一是难以找到满足要求规格的合适安装地点。由于缺乏综合决策支持工具来考虑影响同类电站最佳选址的所有参数,这种情况进一步恶化。在这种情况下,当前工作的主要目的是在地理信息系统的基础上制定适当的选址程序,考虑到影响新可再生能源电站最佳选择的主要参数,并将爱琴海的Syros岛作为测试案例研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RES-based power plants siting using geographical information systems
One of the main reasons for the delay of renewable energy sources (RES) applications in Greece is the difficulty of finding a proper location for their installation that will satisfy the required specifications. The situation is further aggravated by the lack of an integrated decision support tool, taking into consideration all the parameters affecting the optimum siting of similar power stations. In this context, the main aim of the current work is to develop an appropriate siting procedure on the basis of geographical information systems, taking into consideration the main parameters affecting the best choice of a new RES power station ands using as a test case study the island of Syros in the Aegean Sea.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信