移动变电站:应用、工程和结构动力学

J. Lopez-Roldan, J. Enns, P. Guillaume, C. Devriendt
{"title":"移动变电站:应用、工程和结构动力学","authors":"J. Lopez-Roldan, J. Enns, P. Guillaume, C. Devriendt","doi":"10.1109/TDC.2006.1668630","DOIUrl":null,"url":null,"abstract":"The current trend in reducing the erection time of substations has driven to the use of pre-mounted assemblies for quick installation in all kind of forms. In such cases the substation components have to be transported mounted in their operation position. Mobile substations are the clearest example. Mobile substations present specific characteristics which make the substation designer to be confronted with problems not affecting to conventional substations (AIS or GIS). The substation equipment must be fixed to a semi-trailer considering the space limitation, insulation distances and not only static but dynamic loads due to transport. The equipment must be fitted in a way to allow a fast installation requiring minimum work. Regular substation components with its support structures have natural frequencies in the normal range of transport motion and then dynamic loads due to vibrations have to be considered. The dynamic forces that occur during transport are of long duration and metal-fatigue has to be taken into account. This paper intends to give an overview of the singular engineering of mobile substations and the special considerations for the application of those substations in the North-American electric network","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Mobile Substations: Application, Engineering and Structural Dynamics\",\"authors\":\"J. Lopez-Roldan, J. Enns, P. Guillaume, C. Devriendt\",\"doi\":\"10.1109/TDC.2006.1668630\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The current trend in reducing the erection time of substations has driven to the use of pre-mounted assemblies for quick installation in all kind of forms. In such cases the substation components have to be transported mounted in their operation position. Mobile substations are the clearest example. Mobile substations present specific characteristics which make the substation designer to be confronted with problems not affecting to conventional substations (AIS or GIS). The substation equipment must be fixed to a semi-trailer considering the space limitation, insulation distances and not only static but dynamic loads due to transport. The equipment must be fitted in a way to allow a fast installation requiring minimum work. Regular substation components with its support structures have natural frequencies in the normal range of transport motion and then dynamic loads due to vibrations have to be considered. The dynamic forces that occur during transport are of long duration and metal-fatigue has to be taken into account. This paper intends to give an overview of the singular engineering of mobile substations and the special considerations for the application of those substations in the North-American electric network\",\"PeriodicalId\":123024,\"journal\":{\"name\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2006.1668630\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

目前减少变电站安装时间的趋势已经推动了使用预安装组件,以便各种形式的快速安装。在这种情况下,必须将变电站部件安装在其操作位置进行运输。移动变电站就是最明显的例子。移动变电站由于其自身的特点,使得变电站设计人员面临着一些不影响常规变电站(AIS或GIS)的问题。考虑到空间限制、绝缘距离以及运输过程中既有静载荷也有动载荷,变电站设备必须固定在半挂车上。设备的安装方式必须允许快速安装,所需的工作最少。常规变电站部件及其支撑结构的固有频率在正常的传输运动范围内,因此必须考虑振动引起的动载荷。在运输过程中所产生的动力是长时间的,必须考虑金属疲劳。本文概述了移动变电站的奇异工程及其在北美电网中应用的特殊注意事项
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Mobile Substations: Application, Engineering and Structural Dynamics
The current trend in reducing the erection time of substations has driven to the use of pre-mounted assemblies for quick installation in all kind of forms. In such cases the substation components have to be transported mounted in their operation position. Mobile substations are the clearest example. Mobile substations present specific characteristics which make the substation designer to be confronted with problems not affecting to conventional substations (AIS or GIS). The substation equipment must be fixed to a semi-trailer considering the space limitation, insulation distances and not only static but dynamic loads due to transport. The equipment must be fitted in a way to allow a fast installation requiring minimum work. Regular substation components with its support structures have natural frequencies in the normal range of transport motion and then dynamic loads due to vibrations have to be considered. The dynamic forces that occur during transport are of long duration and metal-fatigue has to be taken into account. This paper intends to give an overview of the singular engineering of mobile substations and the special considerations for the application of those substations in the North-American electric network
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信