增强风险分析-相对影响分解

B. Shahzad, T. Afzal, R. Irfan
{"title":"增强风险分析-相对影响分解","authors":"B. Shahzad, T. Afzal, R. Irfan","doi":"10.1109/ICICT.2005.1598603","DOIUrl":null,"url":null,"abstract":"Software engineering is an area of development which always has the risk factor present and software engineering can hardly be done on some straight line. So, the manager has to handle the dynamically changing circumstances in order to complete the job. The target of development team is to develop the software according to the requirements within specified time. Wide variety of risks I are present that may grab the development effort. A good manager must ensure that all measures have been taken against the risks that may possibly come. This paper focuses on determining the relative impact of risk factors on the software development activities. Relative impact ratio ensures to determine the direct and indirect impacts of a risk on all activities of software development.","PeriodicalId":276741,"journal":{"name":"2005 International Conference on Information and Communication Technologies","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Enhanced Risk Analysis-Relative Impact Factorization\",\"authors\":\"B. Shahzad, T. Afzal, R. Irfan\",\"doi\":\"10.1109/ICICT.2005.1598603\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Software engineering is an area of development which always has the risk factor present and software engineering can hardly be done on some straight line. So, the manager has to handle the dynamically changing circumstances in order to complete the job. The target of development team is to develop the software according to the requirements within specified time. Wide variety of risks I are present that may grab the development effort. A good manager must ensure that all measures have been taken against the risks that may possibly come. This paper focuses on determining the relative impact of risk factors on the software development activities. Relative impact ratio ensures to determine the direct and indirect impacts of a risk on all activities of software development.\",\"PeriodicalId\":276741,\"journal\":{\"name\":\"2005 International Conference on Information and Communication Technologies\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-08-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 International Conference on Information and Communication Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICICT.2005.1598603\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 International Conference on Information and Communication Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICICT.2005.1598603","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

软件工程是一个始终存在风险因素的开发领域,软件工程很难在一条直线上完成。因此,管理者必须处理动态变化的环境,以完成工作。开发团队的目标是在规定的时间内按照要求开发软件。我所面临的各种各样的风险可能会影响开发工作。一个好的管理者必须确保采取了一切措施来应对可能出现的风险。本文的重点是确定风险因素对软件开发活动的相对影响。相对影响比确保确定风险对所有软件开发活动的直接和间接影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Enhanced Risk Analysis-Relative Impact Factorization
Software engineering is an area of development which always has the risk factor present and software engineering can hardly be done on some straight line. So, the manager has to handle the dynamically changing circumstances in order to complete the job. The target of development team is to develop the software according to the requirements within specified time. Wide variety of risks I are present that may grab the development effort. A good manager must ensure that all measures have been taken against the risks that may possibly come. This paper focuses on determining the relative impact of risk factors on the software development activities. Relative impact ratio ensures to determine the direct and indirect impacts of a risk on all activities of software development.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信