{"title":"电力疏散项目绩效的实证研究:印度背景下的战略布局","authors":"Adarsh Garg, Achintya Ghatak","doi":"10.1177/2319510X19891665","DOIUrl":null,"url":null,"abstract":"In a competitive business environment, project management aligned with the business strategy caters to the organisation goals. Researchers and practitioners are constantly probing into the possible enhancement of the existing approaches to manage projects. Though the relevant literature recommends numerous methodologies to enhance the achievement of project performance, yet the importance of power evacuation projects is still unnoticed and little has been done in this area. This research aims to develop a strategic layout using critical influence factors (CIFs) of power evacuation projects. A survey is carried out in 47 companies which are working on power evacuation projects. The results of the statistical analysis revealed that there is a significant direct and indirect impact of the strategy, risk, contract, information technology (IT) and stakeholders on the project performance with respect to power evacuation projects.","PeriodicalId":283517,"journal":{"name":"Asia Pacific Journal of Management Research and Innovation","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An Empirical Study on Power Evacuation Projects’ Performance: A Strategic Layout in the Indian Context\",\"authors\":\"Adarsh Garg, Achintya Ghatak\",\"doi\":\"10.1177/2319510X19891665\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a competitive business environment, project management aligned with the business strategy caters to the organisation goals. Researchers and practitioners are constantly probing into the possible enhancement of the existing approaches to manage projects. Though the relevant literature recommends numerous methodologies to enhance the achievement of project performance, yet the importance of power evacuation projects is still unnoticed and little has been done in this area. This research aims to develop a strategic layout using critical influence factors (CIFs) of power evacuation projects. A survey is carried out in 47 companies which are working on power evacuation projects. The results of the statistical analysis revealed that there is a significant direct and indirect impact of the strategy, risk, contract, information technology (IT) and stakeholders on the project performance with respect to power evacuation projects.\",\"PeriodicalId\":283517,\"journal\":{\"name\":\"Asia Pacific Journal of Management Research and Innovation\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-02-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Asia Pacific Journal of Management Research and Innovation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/2319510X19891665\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asia Pacific Journal of Management Research and Innovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/2319510X19891665","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在竞争激烈的商业环境中,与商业战略相一致的项目管理迎合了组织的目标。研究人员和实践者都在不断探索如何改进现有的项目管理方法。虽然相关文献推荐了许多方法来提高项目绩效,但电力疏散项目的重要性仍然被忽视,在这方面做得很少。本研究旨在利用电力疏散项目的关键影响因素(ci)进行战略布局。对47家从事电力疏散项目的公司进行了调查。统计分析结果表明,在电力疏散项目中,战略、风险、合同、信息技术和利益相关者对项目绩效有显著的直接和间接影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Empirical Study on Power Evacuation Projects’ Performance: A Strategic Layout in the Indian Context
In a competitive business environment, project management aligned with the business strategy caters to the organisation goals. Researchers and practitioners are constantly probing into the possible enhancement of the existing approaches to manage projects. Though the relevant literature recommends numerous methodologies to enhance the achievement of project performance, yet the importance of power evacuation projects is still unnoticed and little has been done in this area. This research aims to develop a strategic layout using critical influence factors (CIFs) of power evacuation projects. A survey is carried out in 47 companies which are working on power evacuation projects. The results of the statistical analysis revealed that there is a significant direct and indirect impact of the strategy, risk, contract, information technology (IT) and stakeholders on the project performance with respect to power evacuation projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信