{"title":"某电缆厂单机子系统可靠性建模与分析","authors":"S. Z. Taj, S. Rizwan, B M Alkali, D K Harrison, G. Taneja","doi":"10.1109/ICMSAO.2017.7934917","DOIUrl":null,"url":null,"abstract":"This paper presents a real case analysis of a single machine subsystem of a cable plant using reliability modelling. Real maintenance data of a cable plant are collected for this purpose. Three types of maintenance are noted for the subsystem: repair, preventive maintenance random (PMR) and preventive maintenance scheduled (PMS). The subsystem is repaired upon failure, while preventive maintenance (PM) is carried out at random and scheduled basis. Optimum reliability indices such as mean time to subsystem failure (MTSF), availability of the subsystem, expected busy period of the repairman and expected number of subsystem repairs are obtained. Analysis is done using semi Markov processes and regenerative point techniques.","PeriodicalId":265345,"journal":{"name":"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)","volume":"106 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Reliability modelling and analysis of a single machine subsystem of a cable plant\",\"authors\":\"S. Z. Taj, S. Rizwan, B M Alkali, D K Harrison, G. Taneja\",\"doi\":\"10.1109/ICMSAO.2017.7934917\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a real case analysis of a single machine subsystem of a cable plant using reliability modelling. Real maintenance data of a cable plant are collected for this purpose. Three types of maintenance are noted for the subsystem: repair, preventive maintenance random (PMR) and preventive maintenance scheduled (PMS). The subsystem is repaired upon failure, while preventive maintenance (PM) is carried out at random and scheduled basis. Optimum reliability indices such as mean time to subsystem failure (MTSF), availability of the subsystem, expected busy period of the repairman and expected number of subsystem repairs are obtained. Analysis is done using semi Markov processes and regenerative point techniques.\",\"PeriodicalId\":265345,\"journal\":{\"name\":\"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)\",\"volume\":\"106 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMSAO.2017.7934917\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSAO.2017.7934917","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

本文用可靠性模型对某电缆厂单机子系统进行了实例分析。为此收集电缆厂的实际维护数据。该子系统有三种类型的维护:维修、随机预防性维护(PMR)和计划预防性维护(PMS)。子系统在发生故障时进行维修,而预防性维护则是随机和有计划地进行的。得到了分系统平均故障时间(MTSF)、分系统可用性、维修人员预期繁忙时间和分系统预期维修次数等最优可靠性指标。利用半马尔可夫过程和再生点技术进行分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability modelling and analysis of a single machine subsystem of a cable plant
This paper presents a real case analysis of a single machine subsystem of a cable plant using reliability modelling. Real maintenance data of a cable plant are collected for this purpose. Three types of maintenance are noted for the subsystem: repair, preventive maintenance random (PMR) and preventive maintenance scheduled (PMS). The subsystem is repaired upon failure, while preventive maintenance (PM) is carried out at random and scheduled basis. Optimum reliability indices such as mean time to subsystem failure (MTSF), availability of the subsystem, expected busy period of the repairman and expected number of subsystem repairs are obtained. Analysis is done using semi Markov processes and regenerative point techniques.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信