{"title":"了解项目管理成熟度模型的要求:对马来西亚信息和通信技术产业的认识","authors":"R. Jamaluddin, C. Chin, C. Lee","doi":"10.1109/IEEM.2010.5674174","DOIUrl":null,"url":null,"abstract":"Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia's ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.","PeriodicalId":285694,"journal":{"name":"2010 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Understanding the requirements for project management maturity models: Awareness of the ICT industry in Malaysia\",\"authors\":\"R. Jamaluddin, C. Chin, C. Lee\",\"doi\":\"10.1109/IEEM.2010.5674174\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia's ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.\",\"PeriodicalId\":285694,\"journal\":{\"name\":\"2010 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2010.5674174\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2010.5674174","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Understanding the requirements for project management maturity models: Awareness of the ICT industry in Malaysia
Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia's ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.